Project Description

Construction of substructure and superstructure of the bridge alternatives that are governed by their respective heights and spans. There shall be two carriageway units on LHS and RHS units separated by 4m-6m in the median to carry traffic. Each lane unit shall comprise of 3 lanes of traffic, cycle track and side walk / footpath details as follows: 21.50m (overall width of each carriageway unit) = 0.50m (Crash Barrier) + 11.50m (Lane width) + 0.50m (separator – kerb) + 3.50m (Two-way Bicycle Lane) + 5.0m (raised side walk) + 0.50m (Crash Barrier). There shall be two carriageway units on LHS and RHS separated by 3m wide median at the approach roads and at bridge underpass. Each lane unit of Bezawit road at Bridge underpass shall comprises: 2×3.5m carriage way, 5m sidewalk way in the outer side, inner sider walkway shall be as shown in the typical drawings). Clear height for Bridge underpass of Bezawit road shall not be less than 5.50m. Each lane unit of Bezawit road at approach comprises: 2×3.5m carriage way, 3m sidewalk alongside with 2m green area, and 1.5m space for side and/or back slope and auxiliary drains. Construction of ramps made of reinforced concrete slab having 10.1m total width (6.6m carriageway, 2.5m walkway, 0.5m composite parapet at each side) for Bezawit road access to main road and from main road to Bezawit road that are supported by discrete columns.

Services Provided

  • Supervise the activities of the contractor in accordance with the contract between the Contractor and the Employer Coordination and Consultation
  • Technical Works

-Quality Control
-Health and Safety
-Environmental and Social
-Enforcing the Right of Way Removal Process

  • Measurement and Payment
  • Intermediate and Final Project Audits
  • Finalization of Contract
a

Project Description:

Briefly, the project comprises of procurement of services for the survey and project consultancy
for the approximately 41 km long Izmir North Eastern highway (KM: 0 + 000 – 41 + 000).

Services Provided

  • Alternative Route Study
  • Feasibility Study
  • EIA Works
  • Small and Large Structures
  • Tunnel Study and Project Engineering Services
  • Hydraulic and Hydrological Studies
  • Mapping Works
  • Final Design
  • Preparation of Animation and other Visual Documents
  • Carrying out Inspection, Acceptance and Approval
a,

Project Description
Construction Supervision and Consultancy Services for approximately 320 km road project in the 11th
District of Directorate of Highways
1-Between Çobanpınar – Yediveren – Esendere Road Km:0+000,00-40+296,06
2-Between Çukurca-Dağlıca Road Km:0+000,00-58+935,00
3-Between Dağlıca – Oramar Tepe – İkiyaka – Üzümkıran – Ayranlı – Meşelik – Aktütün – Konur –
Uğuraçan – Yaylapınar Road (Section 1) Km:0+000,00-47+580,00 and Between Connecting Road
Km:0+000,00-1+552,38
4-Between Dağlıca – Oramar Tepe – İkiyaka – Üzümkıran – Ayranlı – Meşelik – Aktütün – Konur –
Uğuraçan – Yaylapınar Yolu Km:47+580,00-83+391,53 (Section 2)
5-Between Samanlı – Mordağ – Mirgesav Dağı – Gediktepe – Tanyolu – Alan – Mağaraönü – Çobanpınar
Road Km:0+000,00-49+500 (Section 1) and Connecting Road Km:0+000-2+50 (With the exception of
Şemdinli-Alan Yolu Km:22+000-26+000)
6-Between Samanlı – Mordağ – Mirgesav Dağı – Gediktepe – Tanyolu – Alan – Mağaraönü – Çobanpınar
Road (Section 2) Km:62+250,00-124+138,58
7-Between Serbest Karakolu-Çığlı-Çığlı 39 NHT-Düztepe-Ormanlı-Şentepe-Üzümlü Road Km:0+000,00-
25+266,73 ) Km:62+250,00 – 124+138,58,

Services to be Provided
• Supervision of Project Drawings and Field Conformity
• Supervision of Supplementary Drawings
• Supervision of Road Construction Works Construction Measurements
• Supervision of Road Construction Works
• Quality Supervision of Road Construction Works
• Materials Supervision of Road Construction Works
• Supervision of construction of Bridge and Structures
• Filling-Cutting Works Construction Supervision
• Asphalt and Superstructure Construction Supervision
• Landscaping Works Supervision
• Traffic Signs and Signalization Works Supervision
• Supervision of Construction Work Method and Job Safety
• Supervision of Measures of Environmental Impact Assessment (EIA) Report
• Works Progress, Data Processing and Preparation of Documentation
• Preparation of Progress Payment, Final Account and as-built

n

Project Description:

The Project includes Survey and Project Consultancy Services for roads within the area of the 8th Regional Directorate, Including Palu – Beyhan – Gökdere Provincial Highway (3rd Section).

Services Provided

  • Corridor Survey
  • Project Horizontal Vertical Line Determination and Preparation of Reports
  • Map Production
  • Geotechnical and Geological Studies and Investigations
  • Hydraulic and Hydrological Studies
  • Interchange Projects
  • Drainage Projects
  • Metrics File
  • Bridge Projects
  • Small Architectural (Hydraulic Culvert and Underpass) Projects
  • Traffic Studies (Traffic Safety, Signage, Auto Railings)
  • Landscaping Projects
  • Preparation of Layouts and Preparation of Project Final Report
s

Project Description:

The Project  briefly covers the 12 km Bupati road and the 2 km forest road, which seperates at Bupati.

Services Provided

  • Corridor Survey
  • Project Horizontal Vertical Line Determination and Preparation of Reports
  • Geotechnical Investigations
  • Drainage Projects
  • Metrics File
  • Bridge Projects
  • Small Architectural (Hydraulic Culvert and Underpass) Projects
  • Preparation of Layouts and Preparation of Project Final Report
l
s
d

This Project is executed according to the FIDIC condition of contract. Funded by World Bank (IBRD)

Project Description

The Work comprises of the construction of a link road (around 20Km- 4-lanes divided) between Girsheen intersection and Suheila intersection. The work also includes the construction of at –grade intersections, Four Underpasses for U-turn movement and six Layby areas in addition to the construction of all drainage structures, road furniture (marking, signage and safety barriers) and all other related works as indicated and / or directed.

Services Provided

  • Construction Supervision
  • Design review and detailed design activities are carried out to the appropriate technical standards;
  • Traffic Studies
  • Supervision services for widening, reconstruction, rehabilitation and construction
  • Determination of horizontal and vertical alignment and preparation of the reports
  • Hydrological and Hydraulic Surveys
  • Interchange Design
  • Hydraulic culvert and underpasses – overpasses designs
  • Drawings and preparation of final report
  • Drainage Works
  • Bill of Quantities
  • Landscape Design
t
worldbank_logo
EIB-LOGO

Funded by European Investment Bank (EIB) and the World Bank (IBRD).

Project Description

Road Rehabilitation Safety Project is a project to the Government of Serbia in implementation of first phase of the Government’s Program for the period 2014-2019. Implementation of works on heavy maintenance of roads, the Project will include activities, procedures and processes that advance contracting the Works. A key step of this phase provision of detailed designs for heavy maintenance that would be completed in compliance with modern principles of safe road designing.
Related project consist of the Lots following below:

  • LOT 1: IB 13, Section: Zrenjanin (Ecka) – Ecka, L= 8.620 km
  • LOT 2: IB 21, Section: Kosjeric (Varda) – Pozega, L= 22.135km
  • LOT 3: IB 21, Section: Ivanjica – Sjenica, L= 23.036 km
  • LOT 4: IB 22, Section: Raska (K. Mitrovica) – Novi Pazar (Banja), L= 17.974 km

Services Provided

  • Detailed Engineering Design
  • Traffic Counting
  • Detailed Design for Geodetic Surveys
  • Study on Engineering, Geological and Geotechnical Surveys
  • Assessment of the Existing Pavement Condition
  • Assesment of the Condition of System for Draining Pavement and Road Base
  • Environmental Management Plan
p
worldbank_logo

Funded by World Bank – IBRD

Project Description

Road Rehabilitation Safety Project is a project to the Government of Serbia in implementation of first phase of the Government’s Program for the period 2014-2019. Implementation of works on heavy maintenance of roads, the Project will include activities, procedures and processes that advance contracting the Works. A key step of this phase provision of detailed designs for heavy maintenance that would be completed in compliance with modern principles of safe road designing.
Related project consist of the Lots following below:

  • LOT 1: IA1, Section: Razanj 1 – Paracin 1, L=24.781 km
  • LOT 2: IA1, Section: Aleksinac 1 – Razanj 1, L=23.645 km
  • LOT 3: IA3, Section: Sremska Mitrovica – Ruma 1, L=13.750 km
  • LOT 4: Ia3, Section: Ruma 1 – Pecinci 1, L=12.990km

Services Provided

  • Detailed Engineering Design
  • Traffic Counting
  • Detailed Design for Geodetic Surveys
  • Study on Engineering, Geological and Geotechnical Surveys
  • Assessment of the Existing Pavement Condition
  • Assesment of the Condition of System for Draining Pavement and Road Base
  • Environmental Management Plan
t
ü
i

This Project is executed according to the FIDIC (MDBs) Harmonized Edition 2010. Funded by Saudi Fund for Development (SFD)

Project Description

The Ministry of Infrastructure plans to continue widening of the M2 national road, Pristina-Mitrovica, the project is designed to expand the M2 national road, from the Lum i Madh to the exit of Vushtrri. In this Consulting Service, is required to review, design and construction supervision of National Road M2: segment Lumi Madh – Vushtrri – Mitrovica. The beginning of the track is at Lumi Madh village and the end of the track will be at the entrance to Mitrovica (L=20km), the final points will be assigned by the Ministry of Infrastructure.  Task 1 – Detailed Engineering Design (the section from 21.50km to 26.7km); Task 2 – Review of Existing Detail Design Documents (the section from 7.165km to 16.95km); Task 3 – Preparation of Technical Specification and Bidding Documents including selection, evaluation and recommendation on the qualified contractors for both sections Task 4 – Supervision of Works and Contract management along with IPC certification and approvals for both sections.

Services Provided

BOTEK will perform in following Task:

  • Preparation the Detailed Engineering Design (the section from 21.50km to 26.7km);
  • Review of Existing Detail Design (the section from 7.165km to 16.95km);
  • Assistances in Preparation of Technical Specification and Bidding Documents, evaluation and recommendation on the qualified contractors;
  • Supervision of Works and Contract management along with IPC certification and approvals (the section from 7.165km to 16.95km and section from 21.50km to 26.7km).
ğ
1
c

Project Description

Projects consist of Consultancy Services design review and construction supervision of road works (20.3km) including two fly overs and bus stations along the road.

Services provided; Review the design to ensure technical soundness prior to implementation of the works. Carry out Supervision of Works to ensure compliance with the approved design, drawings, specifications, conditions of contract and sound engineering practice. Review of the proposed traffic deviations during construction to ensure that the proposed traffic arrangement results in minimal disruption. Carry out supervision of activities during the defect liability period.

The duration of the assignment is 46 months with 248 staff months.  Construction work cost is US$ 200 million.

The contract is standard United Republic of Tanzania Government procurement contract in accordance with AfDb rules and procedures for the use of consultants. The Construction Supervision is in accordance with the FIDIC conditions of contract.

Technical Category of the road is: State Roads in an urban area.


Services Provided

  • Design review and detailed design activities are carried out to the appropriate technical standards;
  • Traffic Studies
  • Supervision services for widening, reconstruction, rehabilitation and construction
  • Determination of horizontal and vertical alignment and preparation of the reports
  • Hydrological and Hydraulic Surveys
  • Interchange Design
  • Hydraulic culvert and underpass designs
  • Drawings and preparation of final report
  • Drainage Works
  • Bill of Quantities
  • Landscape Design