Name of Client: Ministry of Transport and Logistics
Location within Counrty:Maputo
Duration of Assignment: 23 Months
Project Description:
The DEPOT is intended for the administration, provision of maintenance services, parking, battery charging, and digital services for the operation of a fleet of up to 110 battery electric buses (BEB) of 18m length, articulated, in the BRT service operating in the Maputo Metropolitan area, to be located in the Khamavota Municipal District, next to Praça da Juventude. The CBD Holding area will have minimal driver support facilities, and space for parking up to 50 buses during the day, as well as charging units for up to 20 buses. Ablution facilities, a rest area and a small kitchen area will also be provided. Tranche one will include all the investigations and design work whilst Tranche two (conditional tranche) will include the bid evaluation activities and contract negotiation for the winning bid. Tranche three (conditional tranche) will cater for the construction supervision.
Tranche 1 (firm): Prefeasibility studies, architectural, environmental, and engineering Detailed Design
Tranche 2 (Conditional): Support to bid evaluation
Tranche 3 (Conditional): Construction supervision
Services Provided:
Tranche 1 (firm): Prefeasibility studies, architectural, environmental, and engineering Detailed Design
- Phase I: The Prefeasibility Design -– studies and surveys of the site
- Geotechnical studies
- Hydrological Studies
- Topographic survey
- Traffic Impact Study
- The Environmental and Social Design of the DEPOT construction and operations
- Phase II: The architectural, environmental, and engineering Detailed Design
- Preliminary design and feasibility studies
- Detailed design
- Phase III: The Design Documentation and Tender Dossier for Works
- The architectural, environmental, civil, mechanical and digital designs
- Working Buildings layouts and drawings
- Structural layouts, drawings, drainage-drainage design, cuts, sections
- Measurements, Budget and Calculations
Tranche 2 (Conditional): Support to bid evaluation
- Assist the Client in conducting the bid evaluation, based on the Bidding Documents produced during Tranche one activities.
Tranche 3 (Conditional): Construction supervision
- Prepare baseline works program and issue construction documentation in accordance with the documentation and construction program.
- Receive, comment and approve interim payment valuations.
- Check and approve drawings for design intent compliance.
- Issue contract instructions as and when required.
- Review and comment on operations and maintenance manuals, guarantees, certificates and warranties.
- Inspect the works and issue practical completion and defects lists.
- Assist in obtaining statutory certificates.
- Review the outputs of quality assurance procedures, advise the contractor and client on the adequacy and need for additional controls, inspections and testing.
- Assist in the resolution of contractual claims by the contractor.
Inspect the works and issue practical completion and defects lists.