Tanzania – Consultancy Services for Feasibility Study, Detailed Engineering Design

Project Description

Singida Urban – Ilongero – Haydom Road (93.3km) starts at Njuki along Singida – Nzega Trunk road about 3km from Singida town towards Nzega and branch to right, passing through various Villages including Ntipa, Ntonge, Ilongero, Kijota, Mtinko, Mudida, Singa, Nkungi, Kidarafa and ends at Haydom at the junction to Katesh/Dongobesh in Manyara Region. 81.5 km are in Singida region while the remaining 11.8 km are in Manyara region.

 

Services Provided

  • Feasibility Study
  • Preliminary survey and soils investigations,
  • Economic Analysis,
  • Preliminary design,
  • Preliminary Environmental & Social Impact Assessment,
  • Preliminary resettlement action Plan.