Project Description:
The project briefly covers the ongoing construction of Çankırı, Karabük and Kastamonu region roads Supervising and Consulting Services.
- The total length of the constructed the road is approximately 200 km.
- The road has stop lanes.(2m+2m)
- The conditions of contract/procurement rules is The Public Procurement Law of Türkiye (KIK4734)(FIDIC equivalent conditions)- Dispute Adjudication Board (DAB)
- The road has 2 to 4 driving lanes(2×2)(2×1)
Category of the specific road section: 2×2-2×1 lane width 3.5 m + State-Province Road+ Refuge 4 m (Total road width 10m-21 m) + Bituminous Hot Mix
Services Provided:
- Supervision of Road Construction Works and Construction Measurements
- Supervision of Supplementary Drawings
- Quality Supervision of Road Construction Works
- Materials Supervision of Road Construction Works
- Supervision of construction of Bridge, Tunnel and Structures
- Filling-Cutting Works Construction Supervision
- Landscaping Works Supervision
- Traffic Signs and Signalization Works Supervision
- Environmental and Social Impact Supervision
- Works Progress, Data Processing and Preparation of Documentation
- Preparation of Progress Payment, Final Account and as-built reports
- Health and Safety Management on site
- Liaise and coordinate with utilities (telecommunication lines, water, energy, gas pipeline, sewerage etc.) other stakeholders and contractors as required;