Project Description

The European Investment Bank has provided a fund for the Government of Turkey, a portion of which is to be utilized in the reconstruction of the 50 km long urban roads in Düzce and Gölyaka. In Düzce (Center) and Gölyaka; constant controlling of all manufactures pertaining to the reconstruction work of roads damaged at a great extent due to the earthquake and infrastructural works after earthquake and infrastructural works after earthquake and executing necessary engineering services.

This project is executed according to the  FIDIC Red Book.

Project Summary

  • Monitoring and Inspection of the construction
  • Quality Control of the Works
  • Supervision of Cut-fill Works
  • Supervision of Asphalt Pavement Works
  • Final Accounts and Payment Certificates
5714439446fd9
57144398f32f5
57144394476f1

Project Description

It was founded at the Tuzla / ISTANBUL for the purpose of manufacturing paint and varnish for Wood and Furniture. It is a full automatic facility. Automation system was settled by Emerson Company and System. Installations and Boilers were imported from Italy.

The factory building has;

  • 32.000 m2 Opened Space
  • 16.500 m2 Closed Space
  • 4.800 m2 Finished Good Warehouse
  • 3.600 m2 Production Facility
  • 3.400 m2 Office Laboratory
  • 1.200 m2 Resin Production Facility

Services Provided

  • Design Check
  • Preparing Tender Documents
  • Construction
train
trainn
1200x627-1552845240806

Project Description

BOTEK has been completing the works for this very important and comprehensive railway project which is the connecting line of Europe and Turkey. This railway contributes great amounts to development and improvement of these mostly agricultural region and exportation of their production. For this reason, during the feasibility studies and planning stage, these vital subjects have taken into consideration for the economy, tourism and transportation sectors of Turkey. The project of 230 km long Halkali-Bulgaria Dual Line Railway includes the following studies:

  • 1/25000 scale route investigation
  • Preparation of 1/2000 scale maps with the route drawn of these maps.
  • Design of railway structures such as tunnels, bridges, viaducts, retaining walls etc., station buildings and the railway itself in accordance with the provision of the technical specifications.
  • Station design
  • Design of electrification, signaling and telecommunication
  • Feasibility Studies
  • Environmental Impact Assessment report of the route
  • Preparation of expropriation plans
  • Execution of boreholes, laboratory testing and other soil investigation studies
  • Preparing of bill of quantities and tender documents

Maximum Design Speed: 250 km/h

Services Provided

  • Route Studies (Corridor Investigation)
  • Mapping and Expropriation Plans
  • Plans and Longitudinal Sections
  • Hydraulic – Hydrological Studies
  • Drainage System Design
  • Soil investigations
  • Final railway design
  • Preparation of the Detail Designs Regarding the Structures (Tunnels, Bridges, Retaining Walls etc.)
  • Cross-sections
  • Boreholes and Laboratory Testing
  • Environmental Impact Assessment
  • Final Design Report
566ba414-iletisim
Camsan-fabrika-gorsel
02d5ecf9-classic-banner

Project Description

ÇAMSAN – ORDU Wood Factory is active since 1984 over a surface of 162.000 m2 out of which 42.000 m2 comprise to indoor area.

Being the first MDF (Medium Density Fiberboard) producer in Turkey, ÇAMSAN has established its first MDF factory in 1984 in Ordu and started its production with a capacity of 200 m3 per day. ÇAMSAN which carried the honor of introducing this technology for the first time in Turkey still maintains its pioneer position as for the quality, capacity and product varieties that it offers. ÇAMSAN Inc. carries the responsibility of being the first and the pioneer on its branch and never deviates from its quality and line. In other words when MDF is mentioned, ÇAMSAN Inc. is the first company recalled in Turkey.

Services Provided

  • Cost Analysis
  • Design Check
  • Preparing Tender Documents
  • Quality Control
57143c037da63

Project Description

This project connects the city of Çankırı to capital Ankara. The 84 km long state highway was designed as two lane dual carriage highway. The Project is implemented to provide more efficient land transport of cargo between Çankırı and Ankara. Ankara is the largest city in the middle of Turkey and is commercial social center of the region. To cope with the rapidly deteriorating traffic conditions due to ever increasing population in urban areas of Ankara the construction of the İskilip Highway Road became a definite requirement.

Services Provided

  • Review of Conceptual Design
  • Field Surveys
  • Soil Investigation
  • Digital Ground Modeling
  • Final Highway Design
  • Detailed Bridge Design
  • Drainage Design
  • Expropriation Studies
  • Environmental Impact
  • Traffic Study
  • Preparation of Bill of Quantities
  • Tender Assistance to State
  • Highway Directorate
57143e5800d6c
57143e1f0964c
57143e1f090b8

Project Description

The project purpose was for the preparation of preliminary and final design of 2 major interchanges and (2×3) connecting roads. The pre-existing state highway was a two lane dual carriageway intersecting the city through these two interchanges. The upgrade was for these two major intersections and related roads enhanced provide of a smoother traffic flow pattern through rush-hours during serious traffic congestion.

All of the technical studies, field investigations and related services for the detailed design stage of the project were perform finalized by BOTEK.

Estimated Construction Cost: 20 Million US $

Project Details

Interchanges

Bridges with Spans

Underbridges

Diamond Interchanges

Box Sectional Underbridges

Services Provided

  • Field Survey
  • Geotechnical Survey
  • Preliminary Design
  • Final Highway Design
  • Structural Detailed Design
  • Drainage Design
  • Cross Sections
  • Earthworks Calculations
  • Bruckner Calculations
  • Preparation of Bill of Quantities
  • Tender Assistance

 

57143c582ec5f

Project Description

The project included preparation of preliminary and final design of (2×2) state highway approximately 27 km long. The design work has been based on upgrading the highway standards at those sections of the existing Ceyhan – Yumurtalık State Highway which lies south of Turkey. In addition to highway design sections, BOTEK also made improvements to the existing sections on the horizontal and vertical geometric standards.

The design work included the following: Topographical and other field surveys, structural evaluation and design, drainage and hydrological studies and design, soils and materials investigations, pavement evaluation and design, preparation of complete construction plans.

Project Details

11 at-grades interchanges
5 river bridges
1 overpass

Services Provided

  • Review of Conceptual Design
  • Field Surveys
  • Environmental Impact Assessment
  • Design of Hydrological Structures
  • Final Detailed Design of
  • Ancillary Structures
  • Drainage Design
  • Cross Sections
  • Bruckner Calculations
  • Soil Investigation
  • Traffic Study
  • Preparation for the Bill of Quantities
  • Assistance to State Highways Directorate on Tender Procedures
5714379af28fa
5714379af2e7c
5714382b61f7c

Project Description

Ankara – Pozantı (Çiftehan – Pozantı Section) Motorway is the part of Trans-European Motorway (TEM) connecting western Anatolia to the southern Anatolia starting from Ankara. BOTEK has provided supervision and engineering consultancy services for 18.498 km long, 3-lane Motorway comprises earthworks, structures, bridges and viaducts, tunnels, administrative and service buildings, toll plaza, road pavement, security, traffic and secondary works, for the Ankara – Pozantı Motorway .

Project Summary

  • Lighting Works comprising all motorway, toll plaza, tunnels, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares
  • Emergency communications system works include phones, cabling, power source, posts and other works and spares
  • Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations
  • Arrangement and planning ofside roads and facilities located alongside of the motorway
  • Motorways (2×3) 16.046 km
  • Connection Roads    (2×2)   2.452 km

TOTAL: 18.498 km

As can be seen from the description of actual services provided by our staff together with the absence of PIU unit in this project, BOTEK in reality, while executing the main duties of the Consultant, also fulfilled the task that was expected from a PIU unit, as far as quality control and,  financial and administrative duties were concerned.

Project Summary

  • Culverts
  • Under-Passes
  • Under-pass bridges having total length of 81 m
  • Interchange Bridges having total length of 117 m
  • Viaducts having total length of 2470 m
  •  Twin Tube Tunnels;
    • Kırkgeçit Tunnel: 2 x 497 m
    • Çakıt Tunnel: 2 x 469 m
  • Toll Plaza
  • Reinforced concrete retaining walls having total length of 10.383 m

Reinforced concrete piles having total length of 38400 m will be constructed for the foundations of viaducts and bridge

Building Summary

Within the scope of Çiftehan – Pozantı Section of Ankara – Pozantı Motorway, there exist;​

  • Supervision of Motorway Construction
  • Supervision of Viaduct, Bridge & Structure
  • Supervision of Motorway Barriers and
  • Railings Mountings
  • Supervision of Construction of Facilities,
  • Parking and Maintenance Areas, Service
  • Stations, Toll Plazas, Administrative and
  • Public Buildings
  • Supervision of Motorway Landscape Works
  • Supervision of Pavement and Earthworks
  • Supervision of Electric and Water Line
  • Installations
  • Supervision of Lighting Works
  • Traffic Census
  • Traffic Signs and Signalization
  • Drainage Works
  • Landscape Studies and Planning
  • Design Review
  • Quality Control
  • Data processing and Documentation
  • Preparation of Final Accounts and Payment Certificates
57143ec48803c
57143ec488607

Project Description

The Orhangazi-Bursa Section is the northward section of the Bursa Peripheral Highway which forms a part of the İstanbul – Bursa – Balıkesir – İzmir Motorway. This dual-three lane motorway was 34 km. long and forms part of the İzmit Bay Crossing and Motorway which is planned to be expanded in the future.

Izmit and Gemlik Bays have great dual importance with respect to trade and industry. In addition to this, the lands on the route of Motorway are very fertile so agriculture and farming are well developed in these regions. Therefore BOTEK has taken all of these important factors and conditions into consideration and design the motorway for future traffic flow and forthcoming necessity. BOTEK has also determined the conditions in order to protect the nature, agriculture and structures in the vicinity of the motorway from harmful effects of all sorts of materials used against icing on the surface of the motorway and on the structures and established systematic solutions for the installations and structures to be used for prevention and purification, and examined the design outlines of the motorway, connection and frontage roads and roadside installations from the viewpoint of harmony with nature and ensured the conformity of the motorway with its surroundings.

All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe)

Besides motorway works, BOTEK has also performed following activities:

  • Arrangement and planning ofside roads and facilities located alongside of the motorway
  • Derivation and rehabilitation of 3 streams around the interchanges.
  • Lighting Works comprising all motorway, toll plazas, parking areas, service and maintenance areas, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares
  • Emergency communications system works include phones, cabling, power source, posts and other works and spares
  • Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations

Project Summary

  • Motorway (2×3), (34km)
  • Side Roads(26km)
  • Motorway Interchange Bridges
  • State Highway Interchange Bridges
  •  Viaducts (Approx. 3312 m)
  • Toll plazas
  • Service Area
  • Car park
  • Culverts
  • Under-bridges
  • Over-bridges
  •  Motorway Bridges
  • State Highway Bridge
  • 34,605 m2 Retaining Walls

Services Provided

  • Field Survey
  • Geotechnical Survey
  • Feasibility Study
  • Preliminary Design
  • Final Motorway Design
  • Detailed Structural Design
  • Landscape Design
  • Environmental Impact Assessment and Pollution Prevention Studies
  • Traffic Signs and Signalization
  • Expropriation Plans
  • Cross Sections
  • Earthworks Calculations
  • Bruckner Calculations
  • Preparation of Bill of Quantities and Tender Assistance
57143f7ec9808

Project Description

This project consists of preliminary design and engineering consultancy services for 80 km (2×3) motorway in the south Turkey. Iskenderun-Antakya-Cilvegözü motorway is the extension of Iskenderun motorway which is the last section of the Edirne – Istanbul – Ankara – Tarsus – Adana – Gaziantep – Urfa Motorway Route named as TEM (Transit European Motorway)

TEM (Trans-European North-South Motorway) is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it has the total planned length amounting to 23797 km, out of which 7021 km are currently in operation. All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe).

Project Details

  • Culverts
  • Underbridges
  • Overbridges
  • Interchange Bridges
  • River Bridges
  • Viaducts
  • Motorway Interchanges
  • State Highway Interchange
  • At-Grade Interchange
  • Tunnels total length of 1260 m

Study objectives included investigation of the site conditions including geological, hydrological, and social conditions.

Services Provided

  • Preliminary and Application Design
  • Geotechnical Survey
  • Soil Investigation
  • Field Surveys
  • Earthworks Calculations
  • Bruckner Calculations
  • Cross Sections
  • Drainage Design
  • Preparation of Bill of Quantities