Project Description

Ankara – Pozantı (Çiftehan – Pozantı Section) Motorway is the part of Trans-European Motorway (TEM) connecting western Anatolia to the southern Anatolia starting from Ankara. BOTEK has provided supervision and engineering consultancy services for 18.498 km long, 3-lane Motorway comprises earthworks, structures, bridges and viaducts, tunnels, administrative and service buildings, toll plaza, road pavement, security, traffic and secondary works, for the Ankara – Pozantı Motorway .

Project Summary

  • Lighting Works comprising all motorway, toll plaza, tunnels, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares
  • Emergency communications system works include phones, cabling, power source, posts and other works and spares
  • Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations
  • Arrangement and planning ofside roads and facilities located alongside of the motorway
  • Motorways (2×3) 16.046 km
  • Connection Roads    (2×2)   2.452 km

TOTAL: 18.498 km

As can be seen from the description of actual services provided by our staff together with the absence of PIU unit in this project, BOTEK in reality, while executing the main duties of the Consultant, also fulfilled the task that was expected from a PIU unit, as far as quality control and,  financial and administrative duties were concerned.

Project Summary

  • Culverts
  • Under-Passes
  • Under-pass bridges having total length of 81 m
  • Interchange Bridges having total length of 117 m
  • Viaducts having total length of 2470 m
  •  Twin Tube Tunnels;
    • Kırkgeçit Tunnel: 2 x 497 m
    • Çakıt Tunnel: 2 x 469 m
  • Toll Plaza
  • Reinforced concrete retaining walls having total length of 10.383 m

Reinforced concrete piles having total length of 38400 m will be constructed for the foundations of viaducts and bridge

Building Summary

Within the scope of Çiftehan – Pozantı Section of Ankara – Pozantı Motorway, there exist;​

  • Supervision of Motorway Construction
  • Supervision of Viaduct, Bridge & Structure
  • Supervision of Motorway Barriers and
  • Railings Mountings
  • Supervision of Construction of Facilities,
  • Parking and Maintenance Areas, Service
  • Stations, Toll Plazas, Administrative and
  • Public Buildings
  • Supervision of Motorway Landscape Works
  • Supervision of Pavement and Earthworks
  • Supervision of Electric and Water Line
  • Installations
  • Supervision of Lighting Works
  • Traffic Census
  • Traffic Signs and Signalization
  • Drainage Works
  • Landscape Studies and Planning
  • Design Review
  • Quality Control
  • Data processing and Documentation
  • Preparation of Final Accounts and Payment Certificates
57143ec48803c
57143ec488607

Project Description

The Orhangazi-Bursa Section is the northward section of the Bursa Peripheral Highway which forms a part of the İstanbul – Bursa – Balıkesir – İzmir Motorway. This dual-three lane motorway was 34 km. long and forms part of the İzmit Bay Crossing and Motorway which is planned to be expanded in the future.

Izmit and Gemlik Bays have great dual importance with respect to trade and industry. In addition to this, the lands on the route of Motorway are very fertile so agriculture and farming are well developed in these regions. Therefore BOTEK has taken all of these important factors and conditions into consideration and design the motorway for future traffic flow and forthcoming necessity. BOTEK has also determined the conditions in order to protect the nature, agriculture and structures in the vicinity of the motorway from harmful effects of all sorts of materials used against icing on the surface of the motorway and on the structures and established systematic solutions for the installations and structures to be used for prevention and purification, and examined the design outlines of the motorway, connection and frontage roads and roadside installations from the viewpoint of harmony with nature and ensured the conformity of the motorway with its surroundings.

All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe)

Besides motorway works, BOTEK has also performed following activities:

  • Arrangement and planning ofside roads and facilities located alongside of the motorway
  • Derivation and rehabilitation of 3 streams around the interchanges.
  • Lighting Works comprising all motorway, toll plazas, parking areas, service and maintenance areas, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares
  • Emergency communications system works include phones, cabling, power source, posts and other works and spares
  • Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations

Project Summary

  • Motorway (2×3), (34km)
  • Side Roads(26km)
  • Motorway Interchange Bridges
  • State Highway Interchange Bridges
  •  Viaducts (Approx. 3312 m)
  • Toll plazas
  • Service Area
  • Car park
  • Culverts
  • Under-bridges
  • Over-bridges
  •  Motorway Bridges
  • State Highway Bridge
  • 34,605 m2 Retaining Walls

Services Provided

  • Field Survey
  • Geotechnical Survey
  • Feasibility Study
  • Preliminary Design
  • Final Motorway Design
  • Detailed Structural Design
  • Landscape Design
  • Environmental Impact Assessment and Pollution Prevention Studies
  • Traffic Signs and Signalization
  • Expropriation Plans
  • Cross Sections
  • Earthworks Calculations
  • Bruckner Calculations
  • Preparation of Bill of Quantities and Tender Assistance
57143f7ec9808

Project Description

This project consists of preliminary design and engineering consultancy services for 80 km (2×3) motorway in the south Turkey. Iskenderun-Antakya-Cilvegözü motorway is the extension of Iskenderun motorway which is the last section of the Edirne – Istanbul – Ankara – Tarsus – Adana – Gaziantep – Urfa Motorway Route named as TEM (Transit European Motorway)

TEM (Trans-European North-South Motorway) is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it has the total planned length amounting to 23797 km, out of which 7021 km are currently in operation. All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe).

Project Details

  • Culverts
  • Underbridges
  • Overbridges
  • Interchange Bridges
  • River Bridges
  • Viaducts
  • Motorway Interchanges
  • State Highway Interchange
  • At-Grade Interchange
  • Tunnels total length of 1260 m

Study objectives included investigation of the site conditions including geological, hydrological, and social conditions.

Services Provided

  • Preliminary and Application Design
  • Geotechnical Survey
  • Soil Investigation
  • Field Surveys
  • Earthworks Calculations
  • Bruckner Calculations
  • Cross Sections
  • Drainage Design
  • Preparation of Bill of Quantities
5714401958430

Project Description

Rapid traffic load increase derived from tourism, agriculture, and transit transportation required for a highway crossing study in Çanakkale Region. The Dardanelles suspension steel bridge with 2×3 lanes will provide a traffic flow which would ease the traffic problems of the region for the present and future.

Services Provided

  • Geotechnical Survey
  • Feasibility Survey
  • Preliminary and Application Design
  • Structural Detailed Design
  • Drainage Design
  • Environmental Impact Assessment
  • Cross Sections
  • Service Area Design

Project Details

Suspension Bridge
Suspension steel bridge 2×3 lanes
Total length 2196 m.
Span distances 1440 m.
Length of the approach span on each side: 378 m.

Kilitbahir Side Approach Motorway
Motorway with 2×3 lanes (7 km)

1 Elevated interchange
1 At-grade interchange
1 Toll plaza
3 Twin Tube Tunnels;
   T1 Tunnel: 1210.942 m + 1239.058 m
T2 Tunnel: 302.370   m + 307.630 m
   T3 Tunnel: 428.986   m + 421.015 m

1 Bridge

Çanakkale Side Approach Motorway
Motorway with 2×3 lanes (8 km)
1 Elevated interchange
1 Toll plaza
1600 m. Suspended Bridge Approach Viaduct
1 River Bridge
Intercity access road (5 km)

Roundabout

1 Bridge

Project Details

Suspension Bridge
Suspension steel bridge 2×3 lanes
Total length 2196 m.
Span distances 1440 m.
Length of the approach span on each side: 378 m.

Kilitbahir Side Approach Motorway
Motorway with 2×3 lanes (7 km)

1 Elevated interchange
1 At-grade interchange
1 Toll plaza
3 Tunnels total 2196 m.
1 Bridge

Çanakkale Side Approach Motorway
Motorway with 2×3 lanes (8 km)
1 Elevated interchange
1 Toll plaza
1600 m. Suspended Bridge Approach Viaduct
1 River Bridge
Intercity access road (5 km)

Roundabout

1 Bridge

5714487f5f5f1
5714489b84144
571448820fab0

Project Description

Besides Motorway Design, Construction Supervision and Engineering Services, BOTEK also performed supervision and design for the service buildings of General Directorate of Highways and Toll plazas.

This motorway project comprises two sections. Under the scope of these two sections following structures were built:

  • Maintenance & Operating Areas
  • Parking Areas
  • Service Areas
  • Toll plazas

Total square measure of construction area in three separate sections is 78.000 m2.

Maintenance & Operating areas contain:​

  • Administrative Buildings
  • Dinning Halls

Service Areas were constructed at two separate sections. These sections comprise all necessary managing and administrative buildings. Total square measure of service areas is 360.000 m2

Total square measure of parking areas and other constructed areas is 186.000 m2

In addition to service and parking areas, following structures were constructed in the scope of Pozanti – Tarsus – Mersin Motorway project.

  • Toll plazas
  • Police Stations
  • Gas Station
  • Operating Buildings

Services Provided

  • Cost Analysis
  • Design of Toll Plazas
  • Design of Administrative & Service Buildings
  • Construction Supervision
  • Quality Control

 

 

571444792c9c8
5714447e26eb8

During the Pozanti – Tarsus – Mersin Motorway Design, Construction Supervision and Engineering Services, BOTEK also involved in design of the dwellings for General Directorate of Highways.

These residential buildings was built for General Directorate of Highways Personnel who work in motorway service areas and toll plazas

The dwellings consist from 4 identical apartments. They are 4 storied and each of them has 16 flats.

BOTEK performed design and construction supervision of these dwellings. They are completed in 2003.

57143da398a21
57143da398fc9
57143de47d07b

Project Description

Pozantı – Tarsus – Mersin Motorway is the major and comprehensive part of the Trans-European Motorway which is located at the Mediterranean region of Turkey and it is also one of the most important roads which connect Middle East, South and South Eastern Anatolia. This motorway contributes great amounts to development and improvement of these mostly agricultural region and exportation of their production. For this reason, during the feasibility studies and planning stage, these vital subjects have taken into consideration for the economy, tourism and transportation sectors of Turkey.

In the scope of this project, BOTEK has also made an urban planning for Mersin city which has one of the most active and significant harbours in Turkey. Within the planning project, approximately 40 km long city roads and their motorway connections were designed and supervised including all drainage works, settlement and structure plans, landscape works, earthworks and traffic census and study.

In addition, BOTEK has provided supervision services for 700,000 m2 of park area which is known as the most significant and extensive projects one in Turkey. It comprises administrative buildings, public buildings, parks, restaurants, shops, petrol stations, toilets and all electrical and mechanical installations related with these facilities.

Supervision Services of this Trans-European Motorway (TEM) project have been carried out in three stages:

1.Pozantı – Tarsus Motorway, Section I. (15.266 km)

This Motorway Section starts at Tekir Hill of Pozantı and ends at Çamalan region. At this section, a part of road infrastructure and some of the structures have previously been constructed by (GDH), General Directorate of Highways.

2.Pozantı – Tarsus Motorway, Section II, (30.492 km)

The motorway which is constructed between Pozantı and Tarsus continues as TAG Motorway in Adana – Gaziantep direction towards East and, as Çukurova Motorway in Mersin-Çeşmeli direction towards West.

3.Tarsus Separation, Mersin Motorway (103.00 km)

Besides motorway works, BOTEK was also responsible for following activities:

  • Lighting Works comprising all motorway, toll plazas, parking areas, service and maintenance areas, tunnels, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares
  • Emergency communications system works include phones, cabling, power source, posts and other works and spares
  • Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations
  • Arrangement and planning ofside roads and facilities located alongside of the motorway

Project Summary

  • Pozantı – Tarsus Motorway, Section I:(2×3),   15.266 km
  • Pozantı – Tarsus Motorway, Section II: (2×3),   30.492 km
  • Tarsus – Mersin Motorway: (2×3), 103.000 km
  • Totally 148.7 km Motorway
  • Viaducts (Total Length of 4422 m)
  • Berdan Viaduct (L: 971 Meter)
  • Deliçay Viaduct (L: 893 Meter)
  • İçme Viaduct (L: 425 Meter)
  • Müftü Viaduct (L: 1.088 Meter)
  • Mezitli Viaduct (L: 854 Meter)
  • Mersin – Gözne Road (Outgoing Connection Road on the highway)(L: 191 Meter)
  • Toll Plazas
  • 200 m Long Cut and Cover Tunnel
  • Maintenance Areas
  • Parking Areas
  • Service Areas
  • Over-pass Bridges
  • Under-pass Bridges
  • Interchange Bridges
  • Box Culverts
  • Under-passes
  • Over-passes

Building Summary

Within the scope of Pozantı – Tarsus and Tarsus – Mersin Motorways, there exist;

  • Maintenance and Operating Centres (77,800 m2) each comprising of:
  1. Administrative Building (2 Storey)
  2. Dormitories and Kitchen (4 Storey)
  3. 22×22 (4 Storey) Lodgements
  • Administrative Buildings at each 10 different Toll Plazas
  • Police Stations at 2 different Toll Plazas
  • Parking Areas (185,000 m2) each consisting of toilets, buffets and restaurant buildings
  • Service Stations (367,990 m2) each consisting of petrol stations, restaurants and repair plus maintenance workshops

The grand total of the buildings are approx.   20 000 m2 closed area at a value of nearly EUR 18 Million.

Services Provided

  • Supervision of Motorway Construction
  • Supervision of Viaduct, Bridge & Structure
  • Supervision of Motorway Barriers and Railings
  • Supervision of Construction of Facilities,
  • Parking and Maintenance Areas, Service
  • Stations, Toll Plazas, Administrative and Public
  • Buildings
  • Supervision of Motorway Landscape Works
  • Supervision of Pavement and Earthworks
  • Supervision of Electric and Water Line
  • Installations
  • Supervision of Lighting Works
  • Traffic Census
  • Traffic Signs and Signalization
  • Drainage Works
  • Landscape Studies and Planning
  • Design Review
  • Quality Control
  • Data processing and Documentation
  • Preparation of Final Accounts and Payment

Project Description

This project consists of preliminary and final design, and construction supervision of 2000 – Single unit family homes all infrastructure requirements for 550 Acres, approximately 2,400,000 m².

The Zekeriyaköy Houses, built on 550 acres of Black Sea Cost and consisting of 2000 Single unit villas. The project also consists of Dwellings, Bazaars, Shopping Centers, Hypermarkets, Cafes, Taverns, Common and Personal Parking Areas, and Administrative Buildings. The Contractor is Garanti- Koza Co.

All requirements and features like car parks, common spaces, generators, fire and domestic water tanks e.g. for today’s modern living exist in Zekeriyaköy Houses in the lovely green nature.

All kinds of heat and water insulation techniques were used in the buildings, the main entrances and stairs of which are of granite. Acrylic-based imported paint was applied on the faces. Very simple but good quality materials were used inside the villas and buildings. A parking lot is available for common use; and a surrounding wall was built to ensure security.

Zekeriyaköy Houses are constructed on such a geological zone of Istanbul which has a minimum earthquake risk. All necessary soil tests have been performed and the structures rest on raft foundations. The load-bearing structural frame has been calculated according to the parameters stated in the “Regulations Regarding Structures to Be Constructed in Disaster Zones” which came into force on 01.01.1998. The seismic and structural characteristics of the zone and the building have also be taken into consideration ensuring the resistance and rigidity factors and with the quality of the concrete cast during the construction stage, the safety level which is foreseen in the above mentioned regulation is consequently exceeded.

Services Provided

  • Preliminary and Final Design, Drainage Design
  • Checking and monitoring of construction and installation. (Office based, together with factory and site visits as necessary)
  • Independent review of design, including load definition, structure analysis and details
  • Preparing bill of quantities, Allowance calculations, reporting
  • Material selection, Following up and controlling laboratory tests, Quarry investigation
571445ea015f4
571445ea0107c

Project Description

Kavala Sabancı – Bebek Eliyeşil Villas Project are distinguished residential complexes in Turkey. Complexes consist of 14 private villas in Eliyeşil and 76 villas in Sabancı. Eliyeşil with its individual gardens are built on a hill among century old trees overlooking.

Eliyesil villas have their façade clad with travertine panels and solid hardwood elements. Copper roofs have “Cihannuma”s (small rooms to watch neighboring landscape) which are reminiscent of the Ottoman architecture.

The total construction area of the project which was designed by Arch. Erkut Sahinbas, was 6,156 m2

Services Provided

  • Cost Analyses
  • Preliminary & Final Infrastructure Design
  • Drainage Design
  • Construction Supervision
  • Quality Control
5714407571f12
5f9073c002051
5f9074022e64f

Project Description

Edirne-Kinali section of Trakya Highway is a part of TEM (Transit European Motorway) connecting East Europe to Middle East. The project consists of (2×3) 155 km. motorway and (2×2) connection roads (60 km) with earthworks, structures, bridges and viaducts, tunnels, pavement, security, traffic and secondary works. BOTEK had been associated with Ove Arup InternationalLondon on the project.

TEM (Trans-European North-South Motorway) is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it has the total planned length amounting to 23797 km, out of which 7021 km are currently in operation. All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe).

Services Provided

  • Field, Geotechnical and Geodetical Surveys
  • Soil Investigation
  • Preliminary and Final Design
  • Drainage Design
  • Cross Sections
  • Quality Control of Works