HomeProjects

Projects

AllBridges & TunnelsBuildings & FacilitiesMotorways & HighwaysRail Systems
a

Project Description

It covers Survey and Project Consultancy Services of 19 Km Road.

  • 19.1 Km Final Project
  • 19.1 Km. Traffic Project
  • 19.1km Drainage Project
  • 19.1 Km. Geotechnical Research Engineering Services
  • 5   Interchange Project
  • 6   Viaduct Project (51661 m2)
  • 1  Close-Open Structure Project(145m)
  • 4   Bridge Project(15413 M2)
  • 1  2x(L2x6)Underpass Project (41  M)
  • 12  Bridge Geotechnical Report
  • 4    Double Tube Tunnel (4300,3 m
yol
way
highway

Project Description:

The project includes preliminary and final design services for Alanya – Gazıpaşa separation and Taşkent – Başyayla separation road. 21.8km Surveying and Project Enginerring Services. 21.8km (433.50 Ha) 1/1000 Scale Mapping, 4 Viaduct (7167.63 m2), 1 Bridge Project (1257,42m2), 6 Single Tube Tunnel Project (8998,80m)

Category of the specific road section:  2×1 State Road.

Services Provided

  • Corridor Survey
  • Mapping Works
  • Determination of horizontal and vertical alignment and preparation of the reports
  • Hydrological and Hydraulic Surveys
  • Bridge and Interchange Design
  • Hydraulic culvert and underpass designs
  • Drawings and preparation of final report
  • Drainage Works
  • Bill of Quantities
  • Traffic Studies
  • Landscape Design
r
c

Project Description

This work is the carrying out of the route studies of the approximately 17km long Vezneciler-Edirnekapı-Eyüp-GOP-Sultangazi Railway System Line. The project is determined within the frame of the Istanbul Metropolitan Area Integrated Urban Transportation Plan. Watching out for integration, standardization and also the optimization of the depot-maintenance area, carrying out of the comparative route researches at appropriate scales route alternatives that are to be developed. Determining of appropriate route in the direction of the results of the study, carrying out of the line based transportation studies. Developing of financing model that provides the supporting of the planned rail mass transportation route by real estate investments. Determining of the locations of the stations, the carrying out of the preliminary project designs of the stations and appropriate depot areas. Determining of the operating scenarios, preparing of the construction plans of the selected route with scale of 1/5000 and preparing of the Financial and Economical Feasibility Studies.

Services Provided

  • Project Management
  • Preliminary Design
  • Surveysand reports
    • Geotechnics (seismic study included)
    • Topography Land Survey
    • Traffic
    • Dilapidation
    • EIA/Noise/Vibration
    • Land Usage
    • Utilities
  • Utilities Diversion Design
  • Traffic Diversion Design
  • MEP (Tunne and Station Depot)
  • Power Supply, Communication/Signalization
  • New Urban Zoning Plan, Expropiations
  • Contribution to Design Standards and FS
  • Construction Health and Safety
  • Bill of Quantities and Tender Documents
j
a

Project Description:

The project includes preliminary and final design services for 48km road.

Services Provided

  • Corridor Survey
  • Mapping Works
  • Determination of horizontal and vertical alignment and preparation of the reports
  • Hydrological and Hydraulic Surveys
  • Bridge and Interchange Design
  • Hydraulic culvert and underpass designs
  • Drawings and preparation of final report
  • Drainage Works
  • Bill of Quantities
  • Traffic Studies
  • Landscape Design
b
c
isdb

This Project is executed according to the FIDIC Condition of Contract Funded by Islamic Development Bank (IsDB)

Project Description

This project is located in the islands of Java (in provinces of Central Java and East Java) and Kalimantan (West Kalimantan and East Kalimantan).

Project scope consists of supervision services for Widening, Reconstruction, Rehabilitation and Construction of 77km of National, Provincial and Kabupaten Roads, Bridges and associated Drainage Structures. This is an ISDB financed project.

Services Provided

  • Design review and detailed design activities are carried out to the appropriate technical standards
  • Supervision services for widening, reconstruction, rehabilitation and construction
  • Supervision guidance and organization of constructions supervision teams
  • Establish and monitor construction quality assurance
  • Monitoring of construction schedules comparing actual progress to planned
  • Monitoring of costs and recommendation for approval of payments to contractors
  • Support the Field Team, in supervision of the setting-up, organization and lay out of the Contractor’s field laboratory and in monitoring the mobilization of the equipment
  • Monthly Payment Certificates
a

Project Description

Projects consists of Consultancy Services for Preliminary and Final Design of 240km Motorway

Services Provided

  • Corridor Survey
  • Mapping Works
  • Determination of Horizontal and Vertical Alignment and Preparation of the Reports
  • Hydrological and Hydraulic Surveys
  • Bridge and Interchange Design
  • Hydraulic Culvert and Underpass Designs
  • Drawings and preparation of Final Report
  • Drainage Works
  • Bill of Quantities
  • Traffic Studies
  • Landscape Design
c

Project Description

Ankara – Sivas Railway route is a part of the railway network from west border to east border of Turkey and is located on the railway networks of Europe – Iran, Europe – Middle East and Caucasian countries. Moreover, this line is located on the continuation of Pan-European 4. Corridor. With this project, existing Ankara-Sivas Railway route’s length which is 602 km will be decreased to 461 km. When Ankara – Sivas Railway Project is completed, travelling time between Ankara – Sivas will be decreased from 12 hours to approximately 3 hours.

Services Provided

Infrastructure Supply Works Construction Supervision and Consultancy Services for the Section II KM: 332+300 – 363+527 of the Ankara – Sivas Railway Route.

5f9060f045b57
5f90613851aa1
5f9060a699a0f

Project Description

Project includes Construction Supervision and Consultancy Services for Tokat – Niksar / Turkey Road Km: 0+000 – 48+962. Tokat – Niksar Road is an important arterial road for E80 State Road which provides link between Sivas, Tokat cities and Amasya – Erzincan cities and E70 State Road which connects Samsun and Ordu cities. Moreover, Tokat – Niksar Road includes 8 Bridges which have a total length of 582 m and 18 interchanges.

Services Provided

  • Supervision of Road Construction
  • Supervision of Bridge & Structure Constructions
  • Supervision of Interchanges Constructions
  • Line Installations and Lighting Works
  • Traffic Signs and Signalization
  • Drainage Works
  • Landscape Studies and Planning
  • Quality Control
  • Data Processing and Documentation
  • Preparation of Final Accounts and Payment Certificates
5713ee8f428ad
b

Project Description:

Project consists of Design Review and Construction Supervision Works for 13km section of Batel – Gali – Zakho Road and Design Supervision of Batel and Smail Ava Interchanges in Duhok.

Services Provided

1. Design Review

  • Data Collection and Site Reconnaissance
  • Traffic Study
  • Geometric Design
  • Field Surveys / Topographic Surveys
  • Geotechnical Study / Surveys
  • Hydrological Surveys
  • Structural Concept Design
  • Drainage Concept Design

2. Construction Supervision

  • Ensuring that the notice to commence the works is issued in accordance with contract requirements
  • Supervision of Contractor’s work method, temporary/perminent works, drawings, quality control system etc.
  • Site security and safety, traffic management, health and safety and environmental protection
  • Verification of as-built drawings
  • Approval of drawings for 2 interchanges
c

Project Description

Yusufeli Dam and Hydroelectric Power Plant is located on Coruh River, about 40 km southwest of Artvin City center and about 10 km downstream of Yusufeli Town. It is the highest dam of Turkey and 6th highest dam of Europe.  Yusufeli Dam Access Roads is located alongside the Coruh River. The project consists of survey and project consultancy services for Yusufeli Dam Access Roads including technical studies, preliminary and final design.  Yusufeli Dam Access Road will provide continuous accessibility between Erzurum, Ardahan, Kars provinces and Yusufeli district.

Project Details

  • 7 Bridges
  • 1 Special Bridge
  • 3 Viaducts ( The longest viaduct has a length of 600 m and height of 160 m)
  • 47 Tunnels (Total Length of tunnels: 35 km; The longest tunnel’s length is 3200 m)

Total Length of the roads: 70 km

Services Provided

  • Topographical Surveys
  • Road Structures (Bridge, viaduct etc.)
  • Horizontal-Vertical Alignment Studies
  • Hydraulic Surveys
  • Interchange projects
  • Tunnel Project Services
  • Drainage Works
  • Cross-section and Clearence Drawings, Bruckner
  • Traffic Studies
  • Environmental Impact Assessment