Project Description

The purpose of this subcontract is to complete engineering, complete the excavation performed by others, prepare the subgrade, and construct the foundations and the Superstructure for the Central Reference Laboratory (CRL) building.  Also, review and complete the remaining engineering for the Potable Water Storage Tanks located west of the CRL Building. Design and Furnish all Underground Utilities in Under slab and outside the Building. Design and Furnish Underground Fuel Oil Tank. Upon construction of the foundations and Superstructure, and the water tanks, the buildings will be completed and finished for operation by others.

Project Location

The CRL site is located in the eastern part of Tbilisi approximately three (3) kilometers form the airport, and approximately eighteen (18) kilometers from the Tbilisi Freedom Square, in Alekseevka settlement, within the property owned by the Ministry of Defense (MOD).  The site is fairly flat and the elevations range between 510 meters to 517 meters above the sea level.

Services Provided

  • Mobilization of all personnel, equipment
  • Provide Engineering services and Preparation of all required submittals
  • Performing civil surveys and establishing existing topography and conditions of the site
  • Excavating and disposal of unsuitable subsurface material
  • Setting up a Compaction Test Pads to establish the minimum number of passes of a specific type of compaction equipment proposed for compaction of subgrade and engineered Structural Backfill Material (SBM) for Quality Control
  • Preparing the subgrade, Compacting the subgrade, and compaction testing of the subgrade
  • Installing Polyvinylchloride (PVC) liner on the subgrade and on top of the SBM
  • Supplying and installing SBM
  • Performing Plate Bearing Load Test after installation of SBM
  • Selecting and identifying the source for obtaining engineered SBM
  • Identifying sources of coarse and fine aggregates and testing of aggregates for concrete
  • Developing mix designs for concrete and mortar
  • Procuring, furnishing, and installing rebar and associated accessories
  • Supplying, furnishing and installing structural steel embeds, and accessories
  • Procuring and furnishing embedded piping and other components
  • Forming, placing rebar, pouring concrete for foundation superstructure, testing and curingconcrete
  • Installation of damp proofing, waterproofing, thermal insulation
  • Furnishing and installing roofing system
  • Furnishing services of an independent onsite Material Testing Laboratory
  • Preparing As-Built Drawings and maintaining project records
  • Construction of water storage and oily water filtration facility
  • Site Cleanup and Demobilization
5714352ca26e1
5714352ca2cba
571436c32070e

Project Description

The European Investment Bank has provided a fund for the Government of Turkey, a portion of which is to be utilized in the reconstruction of the urban roads in Düzce, Çilimli, Gölyaka, Cumayeri, Kaynaşlı, Gümüşova, Yığılca, Beyköy, Konuralp, Boğaziçi and Akçakoca which have been damaged during the 1999 earthquake. The total length of roads to be reconstructed is approximately 100 km.

The reconstruction of the roads will begin with the excavation to the necessary depth. This depth will be determined such that it will accommodate the new pavement thickness, consisting of sub-base, binder course and wearing course. In case the soil at the bottom of excavation is found to be unsuitable on which to construct the pavement, then an additional excavation is to be performed and the excavated material is to be replaced with such material whose properties are suitable and allows the construction of the pavement.

This project is executed according to the FIDIC Red Book.

Services Provided

  • Monitoring and Inspection of the construction
  • Quality Control of the Works
  • Supervision of Cut-fill Works
  • Supervision of Asphalt Pavement Works
  • Final Accounts and Payment Certificates
5714350348bb6
571435034928a

Project Description

The purpose of this project is to connect TEM highway to GAP (South Anatolia Project). The highway consists of a 37 km. highway, 17 km. connection roads as well as 3 overpasses 150 m. long, 16 underpasses 192 m. long, a bridge of 40 m. of length and four (bridged type) junctions.

Project Details

  • Approximately 15,000,000 m³ of earth works,
  • 156,000 m³ of concrete, 1,256,000 tons of sub- base,
  • 896,000 tons of mechanic stabilization base and
  • 762,000 tons of bituminous hot mix asphalt works were realized.

Services Provided

  • Preliminary and Final Design
  • Detailed Bridge Design
  • Elevated Interchange, Viaduct and Suspension Bridge Design
  • Drainage Design
  • Service Area Design

Project Description

This project consists of detailed design for Sariyer Maden UnderPass Bridge and Grade Separated Interchange Bridge and Road.

Scope of the Project

  • Design of road structures
  • Geotechnical Survey, Soil Investigation
  • Field Surveys
  • Drainage Design
  • Earthworks Calculations, Bruckner Calculations, Cross Sections
  • Bridge Design
  • Interchange Design
  • Bill of Quantities

Services Provided

  • Review of Control Drawings
  • Provision of Route Study
  • Identification and Assessment
  • Provision of Preliminary Design
  • Provision of Final Design
  • Provision of Supplementary Drawings
  • Data Processing and Documentation

Project Description

This project consists of detailed design for Gaziosmanpasa Hadimkoy TEM OverPass Bridge Widening and Connection Road and Intersection.

Scope of the Project

  • Design of road structures
  • Geotechnical Survey, Soil Investigation
  • Field Surveys
  • Drainage Design
  • Earthworks Calculations, Bruckner Calculations, Cross Sections
  • Bridge Design
  • Intersection Design

Services Provided

  • Review of Control Drawings
  • Provision of Route Study
  • Identification and Assessment
  • Provision of Preliminary Design
  • Provision of Final Design
  • Provision of Supplementary Drawings
  • Data Processing and Documentation
57144806e1aa3
57144806e21e4
5714483f20986

Project Description

SFC – DORTEK Industrial Building Project is a    “design-build” project on “turn-key” basis, performed in Kastamonu, Turkey. This Industrial Building is a typical industrial building.

  • Steel Structured Paint Factory
  • 2 Floors
  • 8.082 m2 in Each
  • 16.164 m2 Total Closed Area

The Building was built on Z3 Class soil in Turkish Local Geotechnical and Seismic Code (TDY98), or SC-SD in UBC 97 (uniform Building Code 97).

Primary and secondary structural system of the Building was designed and built with structural steel on a concrete foundation. The roofing and cladding will be insulated sandwich panel system

Services Provided

  • Cost Appraisal
  • Design Check
  • Construction Supervision
  • Quality Control
  • Payment Approval for American EXIM Bank
5714370a72f7b
57143767bf93e
5714370a7351e

Project Description

The European Investment Bank has provided a fund for the Government of Turkey, a portion of which is to be utilized in the reconstruction of the 50 km long urban roads in Düzce and Gölyaka. In Düzce (Center) and Gölyaka; constant controlling of all manufactures pertaining to the reconstruction work of roads damaged at a great extent due to the earthquake and infrastructural works after earthquake and infrastructural works after earthquake and executing necessary engineering services.

This project is executed according to the  FIDIC Red Book.

Project Summary

  • Monitoring and Inspection of the construction
  • Quality Control of the Works
  • Supervision of Cut-fill Works
  • Supervision of Asphalt Pavement Works
  • Final Accounts and Payment Certificates
5714439446fd9
57144398f32f5
57144394476f1

Project Description

It was founded at the Tuzla / ISTANBUL for the purpose of manufacturing paint and varnish for Wood and Furniture. It is a full automatic facility. Automation system was settled by Emerson Company and System. Installations and Boilers were imported from Italy.

The factory building has;

  • 32.000 m2 Opened Space
  • 16.500 m2 Closed Space
  • 4.800 m2 Finished Good Warehouse
  • 3.600 m2 Production Facility
  • 3.400 m2 Office Laboratory
  • 1.200 m2 Resin Production Facility

Services Provided

  • Design Check
  • Preparing Tender Documents
  • Construction
train
trainn
1200x627-1552845240806

Project Description

BOTEK has been completing the works for this very important and comprehensive railway project which is the connecting line of Europe and Turkey. This railway contributes great amounts to development and improvement of these mostly agricultural region and exportation of their production. For this reason, during the feasibility studies and planning stage, these vital subjects have taken into consideration for the economy, tourism and transportation sectors of Turkey. The project of 230 km long Halkali-Bulgaria Dual Line Railway includes the following studies:

  • 1/25000 scale route investigation
  • Preparation of 1/2000 scale maps with the route drawn of these maps.
  • Design of railway structures such as tunnels, bridges, viaducts, retaining walls etc., station buildings and the railway itself in accordance with the provision of the technical specifications.
  • Station design
  • Design of electrification, signaling and telecommunication
  • Feasibility Studies
  • Environmental Impact Assessment report of the route
  • Preparation of expropriation plans
  • Execution of boreholes, laboratory testing and other soil investigation studies
  • Preparing of bill of quantities and tender documents

Maximum Design Speed: 250 km/h

Services Provided

  • Route Studies (Corridor Investigation)
  • Mapping and Expropriation Plans
  • Plans and Longitudinal Sections
  • Hydraulic – Hydrological Studies
  • Drainage System Design
  • Soil investigations
  • Final railway design
  • Preparation of the Detail Designs Regarding the Structures (Tunnels, Bridges, Retaining Walls etc.)
  • Cross-sections
  • Boreholes and Laboratory Testing
  • Environmental Impact Assessment
  • Final Design Report
566ba414-iletisim
Camsan-fabrika-gorsel
02d5ecf9-classic-banner

Project Description

ÇAMSAN – ORDU Wood Factory is active since 1984 over a surface of 162.000 m2 out of which 42.000 m2 comprise to indoor area.

Being the first MDF (Medium Density Fiberboard) producer in Turkey, ÇAMSAN has established its first MDF factory in 1984 in Ordu and started its production with a capacity of 200 m3 per day. ÇAMSAN which carried the honor of introducing this technology for the first time in Turkey still maintains its pioneer position as for the quality, capacity and product varieties that it offers. ÇAMSAN Inc. carries the responsibility of being the first and the pioneer on its branch and never deviates from its quality and line. In other words when MDF is mentioned, ÇAMSAN Inc. is the first company recalled in Turkey.

Services Provided

  • Cost Analysis
  • Design Check
  • Preparing Tender Documents
  • Quality Control