Project Description
SFC – DORTEK Industrial Building Project is a “design-build” project on “turn-key” basis, performed in Kastamonu, Turkey. This Industrial Building is a typical industrial building.
- Steel Structured Paint Factory
- 2 Floors
- 8.082 m2 in Each
- 16.164 m2 Total Closed Area
The Building was built on Z3 Class soil in Turkish Local Geotechnical and Seismic Code (TDY98), or SC-SD in UBC 97 (uniform Building Code 97).
Primary and secondary structural system of the Building was designed and built with structural steel on a concrete foundation. The roofing and cladding will be insulated sandwich panel system
Services Provided
- Cost Appraisal
- Design Check
- Construction Supervision
- Quality Control
- Payment Approval for American EXIM Bank