Project Description:

The project includes preliminary and final design services for 48km road.

Services Provided

  • Corridor Survey
  • Mapping Works
  • Determination of horizontal and vertical alignment and preparation of the reports
  • Hydrological and Hydraulic Surveys
  • Bridge and Interchange Design
  • Hydraulic culvert and underpass designs
  • Drawings and preparation of final report
  • Drainage Works
  • Bill of Quantities
  • Traffic Studies
  • Landscape Design
b
c
isdb

This Project is executed according to the FIDIC Condition of Contract Funded by Islamic Development Bank (IsDB)

Project Description

This project is located in the islands of Java (in provinces of Central Java and East Java) and Kalimantan (West Kalimantan and East Kalimantan).

Project scope consists of supervision services for Widening, Reconstruction, Rehabilitation and Construction of 77km of National, Provincial and Kabupaten Roads, Bridges and associated Drainage Structures. This is an ISDB financed project.

Services Provided

  • Design review and detailed design activities are carried out to the appropriate technical standards
  • Supervision services for widening, reconstruction, rehabilitation and construction
  • Supervision guidance and organization of constructions supervision teams
  • Establish and monitor construction quality assurance
  • Monitoring of construction schedules comparing actual progress to planned
  • Monitoring of costs and recommendation for approval of payments to contractors
  • Support the Field Team, in supervision of the setting-up, organization and lay out of the Contractor’s field laboratory and in monitoring the mobilization of the equipment
  • Monthly Payment Certificates
a

Project Description

Projects consists of Consultancy Services for Preliminary and Final Design of 240km Motorway

Services Provided

  • Corridor Survey
  • Mapping Works
  • Determination of Horizontal and Vertical Alignment and Preparation of the Reports
  • Hydrological and Hydraulic Surveys
  • Bridge and Interchange Design
  • Hydraulic Culvert and Underpass Designs
  • Drawings and preparation of Final Report
  • Drainage Works
  • Bill of Quantities
  • Traffic Studies
  • Landscape Design
5f9060f045b57
5f90613851aa1
5f9060a699a0f

Project Description

Project includes Construction Supervision and Consultancy Services for Tokat – Niksar / Turkey Road Km: 0+000 – 48+962. Tokat – Niksar Road is an important arterial road for E80 State Road which provides link between Sivas, Tokat cities and Amasya – Erzincan cities and E70 State Road which connects Samsun and Ordu cities. Moreover, Tokat – Niksar Road includes 8 Bridges which have a total length of 582 m and 18 interchanges.

Services Provided

  • Supervision of Road Construction
  • Supervision of Bridge & Structure Constructions
  • Supervision of Interchanges Constructions
  • Line Installations and Lighting Works
  • Traffic Signs and Signalization
  • Drainage Works
  • Landscape Studies and Planning
  • Quality Control
  • Data Processing and Documentation
  • Preparation of Final Accounts and Payment Certificates
5713ee8f428ad
b

Project Description:

Project consists of Design Review and Construction Supervision Works for 13km section of Batel – Gali – Zakho Road and Design Supervision of Batel and Smail Ava Interchanges in Duhok.

Services Provided

1. Design Review

  • Data Collection and Site Reconnaissance
  • Traffic Study
  • Geometric Design
  • Field Surveys / Topographic Surveys
  • Geotechnical Study / Surveys
  • Hydrological Surveys
  • Structural Concept Design
  • Drainage Concept Design

2. Construction Supervision

  • Ensuring that the notice to commence the works is issued in accordance with contract requirements
  • Supervision of Contractor’s work method, temporary/perminent works, drawings, quality control system etc.
  • Site security and safety, traffic management, health and safety and environmental protection
  • Verification of as-built drawings
  • Approval of drawings for 2 interchanges
c

Project Description

Yusufeli Dam and Hydroelectric Power Plant is located on Coruh River, about 40 km southwest of Artvin City center and about 10 km downstream of Yusufeli Town. It is the highest dam of Turkey and 6th highest dam of Europe.  Yusufeli Dam Access Roads is located alongside the Coruh River. The project consists of survey and project consultancy services for Yusufeli Dam Access Roads including technical studies, preliminary and final design.  Yusufeli Dam Access Road will provide continuous accessibility between Erzurum, Ardahan, Kars provinces and Yusufeli district.

Project Details

  • 7 Bridges
  • 1 Special Bridge
  • 3 Viaducts ( The longest viaduct has a length of 600 m and height of 160 m)
  • 47 Tunnels (Total Length of tunnels: 35 km; The longest tunnel’s length is 3200 m)

Total Length of the roads: 70 km

Services Provided

  • Topographical Surveys
  • Road Structures (Bridge, viaduct etc.)
  • Horizontal-Vertical Alignment Studies
  • Hydraulic Surveys
  • Interchange projects
  • Tunnel Project Services
  • Drainage Works
  • Cross-section and Clearence Drawings, Bruckner
  • Traffic Studies
  • Environmental Impact Assessment
5713eff88043d
5713eff880b01
5f907337c7d5d

Project Description

The Dualisation Project is aimed at transforming the single-lane Bidbid-Sur carriageway into an all-weather motorway. The scope of work for the first phase involves the construction of the 40km stretch of the existing carriageway from Sarur in Samayil Wilayat to beyond Wadi al Aqq and some adjoining roads. This segment represents Package 1-A of Section 1 of the dualisation project, which will cover the entire 250km length of the carriageway after completion. Moreover, five major wadi bridges at higher elevations, as well as a number of smaller bridges and culverts, will be constructed at key points along the existing carriageway stretch.

BOTEK is responsible for Design, Engineering and Consultancy Services for various Structures.

Services Provided

  • Design, Engineering and Consultancy Services
  • Alternative Design of the Foundations of Bridges
  • Technical Assistance to the Contractor
57a8a703140ee

Project Description

The project includes design of 6 interchanges on existing Batinah Expressway.

Services Provided

  • Topographical survey of each junction location, including identification of existing utilities. (1/1000 scale topographical maps showing existing utilities)
  • Concept highway design of the grade separated interchange, including service roads along both sides of the highway (Interchange plan and profile drawings including at-grade roundabout layout, arrangement of diverting and joining lanes, arrangement of service roads)
  • Concept structural design of the bridge for overpassing road will have 3 lanes in each direction (Design of overpassing bridge containing 3 lanes each way. Plan, elevation, sections and typical details about structural members will be provided. The bridge will have similar appearance as already approved bridges. Special attention will be paid to aesthetic features)
  • Bill of Quantities (BOQ) of construction items
5d13524a01dae

Project Description

The project includes Preliminary and Final Design Services for 48km (2×2) road.

Services Provided

  • Corridor Survey
  • Mapping Works
  • Determination of Horizontal and Vertical Alignment and Preparation of the Reports
  • Hydrological and Hydraulic Surveys
  • Bridge and Interchange Design
  • Hydraulic Culvert and Underpass Designs
  • Drawings and Preparation of Final Report
  • Drainage Works
  • Bill of Quantities
  • Traffic Studies
  • Landscape Design