Project Description:

The Project  briefly covers the 12 km Bupati road and the 2 km forest road, which seperates at Bupati.

Services Provided

  • Corridor Survey
  • Project Horizontal Vertical Line Determination and Preparation of Reports
  • Geotechnical Investigations
  • Drainage Projects
  • Metrics File
  • Bridge Projects
  • Small Architectural (Hydraulic Culvert and Underpass) Projects
  • Preparation of Layouts and Preparation of Project Final Report
l
s
d

This Project is executed according to the FIDIC condition of contract. Funded by World Bank (IBRD)

Project Description

The Work comprises of the construction of a link road (around 20Km- 4-lanes divided) between Girsheen intersection and Suheila intersection. The work also includes the construction of at –grade intersections, Four Underpasses for U-turn movement and six Layby areas in addition to the construction of all drainage structures, road furniture (marking, signage and safety barriers) and all other related works as indicated and / or directed.

Services Provided

  • Construction Supervision
  • Design review and detailed design activities are carried out to the appropriate technical standards;
  • Traffic Studies
  • Supervision services for widening, reconstruction, rehabilitation and construction
  • Determination of horizontal and vertical alignment and preparation of the reports
  • Hydrological and Hydraulic Surveys
  • Interchange Design
  • Hydraulic culvert and underpasses – overpasses designs
  • Drawings and preparation of final report
  • Drainage Works
  • Bill of Quantities
  • Landscape Design
t
worldbank_logo
EIB-LOGO

Funded by European Investment Bank (EIB) and the World Bank (IBRD).

Project Description

Road Rehabilitation Safety Project is a project to the Government of Serbia in implementation of first phase of the Government’s Program for the period 2014-2019. Implementation of works on heavy maintenance of roads, the Project will include activities, procedures and processes that advance contracting the Works. A key step of this phase provision of detailed designs for heavy maintenance that would be completed in compliance with modern principles of safe road designing.
Related project consist of the Lots following below:

  • LOT 1: IB 13, Section: Zrenjanin (Ecka) – Ecka, L= 8.620 km
  • LOT 2: IB 21, Section: Kosjeric (Varda) – Pozega, L= 22.135km
  • LOT 3: IB 21, Section: Ivanjica – Sjenica, L= 23.036 km
  • LOT 4: IB 22, Section: Raska (K. Mitrovica) – Novi Pazar (Banja), L= 17.974 km

Services Provided

  • Detailed Engineering Design
  • Traffic Counting
  • Detailed Design for Geodetic Surveys
  • Study on Engineering, Geological and Geotechnical Surveys
  • Assessment of the Existing Pavement Condition
  • Assesment of the Condition of System for Draining Pavement and Road Base
  • Environmental Management Plan
p
worldbank_logo

Funded by World Bank – IBRD

Project Description

Road Rehabilitation Safety Project is a project to the Government of Serbia in implementation of first phase of the Government’s Program for the period 2014-2019. Implementation of works on heavy maintenance of roads, the Project will include activities, procedures and processes that advance contracting the Works. A key step of this phase provision of detailed designs for heavy maintenance that would be completed in compliance with modern principles of safe road designing.
Related project consist of the Lots following below:

  • LOT 1: IA1, Section: Razanj 1 – Paracin 1, L=24.781 km
  • LOT 2: IA1, Section: Aleksinac 1 – Razanj 1, L=23.645 km
  • LOT 3: IA3, Section: Sremska Mitrovica – Ruma 1, L=13.750 km
  • LOT 4: Ia3, Section: Ruma 1 – Pecinci 1, L=12.990km

Services Provided

  • Detailed Engineering Design
  • Traffic Counting
  • Detailed Design for Geodetic Surveys
  • Study on Engineering, Geological and Geotechnical Surveys
  • Assessment of the Existing Pavement Condition
  • Assesment of the Condition of System for Draining Pavement and Road Base
  • Environmental Management Plan
t
ü
i

This Project is executed according to the FIDIC (MDBs) Harmonized Edition 2010. Funded by Saudi Fund for Development (SFD)

Project Description

The Ministry of Infrastructure plans to continue widening of the M2 national road, Pristina-Mitrovica, the project is designed to expand the M2 national road, from the Lum i Madh to the exit of Vushtrri. In this Consulting Service, is required to review, design and construction supervision of National Road M2: segment Lumi Madh – Vushtrri – Mitrovica. The beginning of the track is at Lumi Madh village and the end of the track will be at the entrance to Mitrovica (L=20km), the final points will be assigned by the Ministry of Infrastructure.  Task 1 – Detailed Engineering Design (the section from 21.50km to 26.7km); Task 2 – Review of Existing Detail Design Documents (the section from 7.165km to 16.95km); Task 3 – Preparation of Technical Specification and Bidding Documents including selection, evaluation and recommendation on the qualified contractors for both sections Task 4 – Supervision of Works and Contract management along with IPC certification and approvals for both sections.

Services Provided

BOTEK will perform in following Task:

  • Preparation the Detailed Engineering Design (the section from 21.50km to 26.7km);
  • Review of Existing Detail Design (the section from 7.165km to 16.95km);
  • Assistances in Preparation of Technical Specification and Bidding Documents, evaluation and recommendation on the qualified contractors;
  • Supervision of Works and Contract management along with IPC certification and approvals (the section from 7.165km to 16.95km and section from 21.50km to 26.7km).
ğ
1
c

Project Description

Projects consist of Consultancy Services design review and construction supervision of road works (20.3km) including two fly overs and bus stations along the road.

Services provided; Review the design to ensure technical soundness prior to implementation of the works. Carry out Supervision of Works to ensure compliance with the approved design, drawings, specifications, conditions of contract and sound engineering practice. Review of the proposed traffic deviations during construction to ensure that the proposed traffic arrangement results in minimal disruption. Carry out supervision of activities during the defect liability period.

The duration of the assignment is 46 months with 248 staff months.  Construction work cost is US$ 200 million.

The contract is standard United Republic of Tanzania Government procurement contract in accordance with AfDb rules and procedures for the use of consultants. The Construction Supervision is in accordance with the FIDIC conditions of contract.

Technical Category of the road is: State Roads in an urban area.


Services Provided

  • Design review and detailed design activities are carried out to the appropriate technical standards;
  • Traffic Studies
  • Supervision services for widening, reconstruction, rehabilitation and construction
  • Determination of horizontal and vertical alignment and preparation of the reports
  • Hydrological and Hydraulic Surveys
  • Interchange Design
  • Hydraulic culvert and underpass designs
  • Drawings and preparation of final report
  • Drainage Works
  • Bill of Quantities
  • Landscape Design
a

Project Description

It covers Survey and Project Consultancy Services of 19 Km Road.

  • 19.1 Km Final Project
  • 19.1 Km. Traffic Project
  • 19.1km Drainage Project
  • 19.1 Km. Geotechnical Research Engineering Services
  • 5   Interchange Project
  • 6   Viaduct Project (51661 m2)
  • 1  Close-Open Structure Project(145m)
  • 4   Bridge Project(15413 M2)
  • 1  2x(L2x6)Underpass Project (41  M)
  • 12  Bridge Geotechnical Report
  • 4    Double Tube Tunnel (4300,3 m
yol
way
highway

Project Description:

The project includes preliminary and final design services for Alanya – Gazıpaşa separation and Taşkent – Başyayla separation road. 21.8km Surveying and Project Enginerring Services. 21.8km (433.50 Ha) 1/1000 Scale Mapping, 4 Viaduct (7167.63 m2), 1 Bridge Project (1257,42m2), 6 Single Tube Tunnel Project (8998,80m)

Category of the specific road section:  2×1 State Road.

Services Provided

  • Corridor Survey
  • Mapping Works
  • Determination of horizontal and vertical alignment and preparation of the reports
  • Hydrological and Hydraulic Surveys
  • Bridge and Interchange Design
  • Hydraulic culvert and underpass designs
  • Drawings and preparation of final report
  • Drainage Works
  • Bill of Quantities
  • Traffic Studies
  • Landscape Design
j
a

Project Description:

The project includes preliminary and final design services for 48km road.

Services Provided

  • Corridor Survey
  • Mapping Works
  • Determination of horizontal and vertical alignment and preparation of the reports
  • Hydrological and Hydraulic Surveys
  • Bridge and Interchange Design
  • Hydraulic culvert and underpass designs
  • Drawings and preparation of final report
  • Drainage Works
  • Bill of Quantities
  • Traffic Studies
  • Landscape Design
b
c
isdb

This Project is executed according to the FIDIC Condition of Contract Funded by Islamic Development Bank (IsDB)

Project Description

This project is located in the islands of Java (in provinces of Central Java and East Java) and Kalimantan (West Kalimantan and East Kalimantan).

Project scope consists of supervision services for Widening, Reconstruction, Rehabilitation and Construction of 77km of National, Provincial and Kabupaten Roads, Bridges and associated Drainage Structures. This is an ISDB financed project.

Services Provided

  • Design review and detailed design activities are carried out to the appropriate technical standards
  • Supervision services for widening, reconstruction, rehabilitation and construction
  • Supervision guidance and organization of constructions supervision teams
  • Establish and monitor construction quality assurance
  • Monitoring of construction schedules comparing actual progress to planned
  • Monitoring of costs and recommendation for approval of payments to contractors
  • Support the Field Team, in supervision of the setting-up, organization and lay out of the Contractor’s field laboratory and in monitoring the mobilization of the equipment