Motorways & Highways

AllBridges & TunnelsBuildings & FacilitiesMotorways & HighwaysRail Systems
5714350348bb6
571435034928a

Project Description

The purpose of this project is to connect TEM highway to GAP (South Anatolia Project). The highway consists of a 37 km. highway, 17 km. connection roads as well as 3 overpasses 150 m. long, 16 underpasses 192 m. long, a bridge of 40 m. of length and four (bridged type) junctions.

Project Details

  • Approximately 15,000,000 m³ of earth works,
  • 156,000 m³ of concrete, 1,256,000 tons of sub- base,
  • 896,000 tons of mechanic stabilization base and
  • 762,000 tons of bituminous hot mix asphalt works were realized.

Services Provided

  • Preliminary and Final Design
  • Detailed Bridge Design
  • Elevated Interchange, Viaduct and Suspension Bridge Design
  • Drainage Design
  • Service Area Design

Project Description

This project consists of detailed design for Sariyer Maden UnderPass Bridge and Grade Separated Interchange Bridge and Road.

Scope of the Project

  • Design of road structures
  • Geotechnical Survey, Soil Investigation
  • Field Surveys
  • Drainage Design
  • Earthworks Calculations, Bruckner Calculations, Cross Sections
  • Bridge Design
  • Interchange Design
  • Bill of Quantities

Services Provided

  • Review of Control Drawings
  • Provision of Route Study
  • Identification and Assessment
  • Provision of Preliminary Design
  • Provision of Final Design
  • Provision of Supplementary Drawings
  • Data Processing and Documentation

Project Description

This project consists of detailed design for Gaziosmanpasa Hadimkoy TEM OverPass Bridge Widening and Connection Road and Intersection.

Scope of the Project

  • Design of road structures
  • Geotechnical Survey, Soil Investigation
  • Field Surveys
  • Drainage Design
  • Earthworks Calculations, Bruckner Calculations, Cross Sections
  • Bridge Design
  • Intersection Design

Services Provided

  • Review of Control Drawings
  • Provision of Route Study
  • Identification and Assessment
  • Provision of Preliminary Design
  • Provision of Final Design
  • Provision of Supplementary Drawings
  • Data Processing and Documentation
5714370a72f7b
57143767bf93e
5714370a7351e

Project Description

The European Investment Bank has provided a fund for the Government of Turkey, a portion of which is to be utilized in the reconstruction of the 50 km long urban roads in Düzce and Gölyaka. In Düzce (Center) and Gölyaka; constant controlling of all manufactures pertaining to the reconstruction work of roads damaged at a great extent due to the earthquake and infrastructural works after earthquake and infrastructural works after earthquake and executing necessary engineering services.

This project is executed according to the  FIDIC Red Book.

Project Summary

  • Monitoring and Inspection of the construction
  • Quality Control of the Works
  • Supervision of Cut-fill Works
  • Supervision of Asphalt Pavement Works
  • Final Accounts and Payment Certificates
57143c037da63

Project Description

This project connects the city of Çankırı to capital Ankara. The 84 km long state highway was designed as two lane dual carriage highway. The Project is implemented to provide more efficient land transport of cargo between Çankırı and Ankara. Ankara is the largest city in the middle of Turkey and is commercial social center of the region. To cope with the rapidly deteriorating traffic conditions due to ever increasing population in urban areas of Ankara the construction of the İskilip Highway Road became a definite requirement.

Services Provided

  • Review of Conceptual Design
  • Field Surveys
  • Soil Investigation
  • Digital Ground Modeling
  • Final Highway Design
  • Detailed Bridge Design
  • Drainage Design
  • Expropriation Studies
  • Environmental Impact
  • Traffic Study
  • Preparation of Bill of Quantities
  • Tender Assistance to State
  • Highway Directorate
57143e5800d6c
57143e1f0964c
57143e1f090b8

Project Description

The project purpose was for the preparation of preliminary and final design of 2 major interchanges and (2×3) connecting roads. The pre-existing state highway was a two lane dual carriageway intersecting the city through these two interchanges. The upgrade was for these two major intersections and related roads enhanced provide of a smoother traffic flow pattern through rush-hours during serious traffic congestion.

All of the technical studies, field investigations and related services for the detailed design stage of the project were perform finalized by BOTEK.

Estimated Construction Cost: 20 Million US $

Project Details

Interchanges

Bridges with Spans

Underbridges

Diamond Interchanges

Box Sectional Underbridges

Services Provided

  • Field Survey
  • Geotechnical Survey
  • Preliminary Design
  • Final Highway Design
  • Structural Detailed Design
  • Drainage Design
  • Cross Sections
  • Earthworks Calculations
  • Bruckner Calculations
  • Preparation of Bill of Quantities
  • Tender Assistance

 

57143c582ec5f

Project Description

The project included preparation of preliminary and final design of (2×2) state highway approximately 27 km long. The design work has been based on upgrading the highway standards at those sections of the existing Ceyhan – Yumurtalık State Highway which lies south of Turkey. In addition to highway design sections, BOTEK also made improvements to the existing sections on the horizontal and vertical geometric standards.

The design work included the following: Topographical and other field surveys, structural evaluation and design, drainage and hydrological studies and design, soils and materials investigations, pavement evaluation and design, preparation of complete construction plans.

Project Details

11 at-grades interchanges
5 river bridges
1 overpass

Services Provided

  • Review of Conceptual Design
  • Field Surveys
  • Environmental Impact Assessment
  • Design of Hydrological Structures
  • Final Detailed Design of
  • Ancillary Structures
  • Drainage Design
  • Cross Sections
  • Bruckner Calculations
  • Soil Investigation
  • Traffic Study
  • Preparation for the Bill of Quantities
  • Assistance to State Highways Directorate on Tender Procedures
5714379af28fa
5714379af2e7c
5714382b61f7c

Project Description

Ankara – Pozantı (Çiftehan – Pozantı Section) Motorway is the part of Trans-European Motorway (TEM) connecting western Anatolia to the southern Anatolia starting from Ankara. BOTEK has provided supervision and engineering consultancy services for 18.498 km long, 3-lane Motorway comprises earthworks, structures, bridges and viaducts, tunnels, administrative and service buildings, toll plaza, road pavement, security, traffic and secondary works, for the Ankara – Pozantı Motorway .

Project Summary

  • Lighting Works comprising all motorway, toll plaza, tunnels, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares
  • Emergency communications system works include phones, cabling, power source, posts and other works and spares
  • Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations
  • Arrangement and planning ofside roads and facilities located alongside of the motorway
  • Motorways (2×3) 16.046 km
  • Connection Roads    (2×2)   2.452 km

TOTAL: 18.498 km

As can be seen from the description of actual services provided by our staff together with the absence of PIU unit in this project, BOTEK in reality, while executing the main duties of the Consultant, also fulfilled the task that was expected from a PIU unit, as far as quality control and,  financial and administrative duties were concerned.

Project Summary

  • Culverts
  • Under-Passes
  • Under-pass bridges having total length of 81 m
  • Interchange Bridges having total length of 117 m
  • Viaducts having total length of 2470 m
  •  Twin Tube Tunnels;
    • Kırkgeçit Tunnel: 2 x 497 m
    • Çakıt Tunnel: 2 x 469 m
  • Toll Plaza
  • Reinforced concrete retaining walls having total length of 10.383 m

Reinforced concrete piles having total length of 38400 m will be constructed for the foundations of viaducts and bridge

Building Summary

Within the scope of Çiftehan – Pozantı Section of Ankara – Pozantı Motorway, there exist;​

  • Supervision of Motorway Construction
  • Supervision of Viaduct, Bridge & Structure
  • Supervision of Motorway Barriers and
  • Railings Mountings
  • Supervision of Construction of Facilities,
  • Parking and Maintenance Areas, Service
  • Stations, Toll Plazas, Administrative and
  • Public Buildings
  • Supervision of Motorway Landscape Works
  • Supervision of Pavement and Earthworks
  • Supervision of Electric and Water Line
  • Installations
  • Supervision of Lighting Works
  • Traffic Census
  • Traffic Signs and Signalization
  • Drainage Works
  • Landscape Studies and Planning
  • Design Review
  • Quality Control
  • Data processing and Documentation
  • Preparation of Final Accounts and Payment Certificates
57143ec48803c
57143ec488607

Project Description

The Orhangazi-Bursa Section is the northward section of the Bursa Peripheral Highway which forms a part of the İstanbul – Bursa – Balıkesir – İzmir Motorway. This dual-three lane motorway was 34 km. long and forms part of the İzmit Bay Crossing and Motorway which is planned to be expanded in the future.

Izmit and Gemlik Bays have great dual importance with respect to trade and industry. In addition to this, the lands on the route of Motorway are very fertile so agriculture and farming are well developed in these regions. Therefore BOTEK has taken all of these important factors and conditions into consideration and design the motorway for future traffic flow and forthcoming necessity. BOTEK has also determined the conditions in order to protect the nature, agriculture and structures in the vicinity of the motorway from harmful effects of all sorts of materials used against icing on the surface of the motorway and on the structures and established systematic solutions for the installations and structures to be used for prevention and purification, and examined the design outlines of the motorway, connection and frontage roads and roadside installations from the viewpoint of harmony with nature and ensured the conformity of the motorway with its surroundings.

All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe)

Besides motorway works, BOTEK has also performed following activities:

  • Arrangement and planning ofside roads and facilities located alongside of the motorway
  • Derivation and rehabilitation of 3 streams around the interchanges.
  • Lighting Works comprising all motorway, toll plazas, parking areas, service and maintenance areas, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares
  • Emergency communications system works include phones, cabling, power source, posts and other works and spares
  • Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations

Project Summary

  • Motorway (2×3), (34km)
  • Side Roads(26km)
  • Motorway Interchange Bridges
  • State Highway Interchange Bridges
  •  Viaducts (Approx. 3312 m)
  • Toll plazas
  • Service Area
  • Car park
  • Culverts
  • Under-bridges
  • Over-bridges
  •  Motorway Bridges
  • State Highway Bridge
  • 34,605 m2 Retaining Walls

Services Provided

  • Field Survey
  • Geotechnical Survey
  • Feasibility Study
  • Preliminary Design
  • Final Motorway Design
  • Detailed Structural Design
  • Landscape Design
  • Environmental Impact Assessment and Pollution Prevention Studies
  • Traffic Signs and Signalization
  • Expropriation Plans
  • Cross Sections
  • Earthworks Calculations
  • Bruckner Calculations
  • Preparation of Bill of Quantities and Tender Assistance
57143f7ec9808

Project Description

This project consists of preliminary design and engineering consultancy services for 80 km (2×3) motorway in the south Turkey. Iskenderun-Antakya-Cilvegözü motorway is the extension of Iskenderun motorway which is the last section of the Edirne – Istanbul – Ankara – Tarsus – Adana – Gaziantep – Urfa Motorway Route named as TEM (Transit European Motorway)

TEM (Trans-European North-South Motorway) is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it has the total planned length amounting to 23797 km, out of which 7021 km are currently in operation. All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe).

Project Details

  • Culverts
  • Underbridges
  • Overbridges
  • Interchange Bridges
  • River Bridges
  • Viaducts
  • Motorway Interchanges
  • State Highway Interchange
  • At-Grade Interchange
  • Tunnels total length of 1260 m

Study objectives included investigation of the site conditions including geological, hydrological, and social conditions.

Services Provided

  • Preliminary and Application Design
  • Geotechnical Survey
  • Soil Investigation
  • Field Surveys
  • Earthworks Calculations
  • Bruckner Calculations
  • Cross Sections
  • Drainage Design
  • Preparation of Bill of Quantities