Project Description

The Orhangazi-Bursa Section is the northward section of the Bursa Peripheral Highway which forms a part of the İstanbul – Bursa – Balıkesir – İzmir Motorway. This dual-three lane motorway was 34 km. long and forms part of the İzmit Bay Crossing and Motorway which is planned to be expanded in the future.

Izmit and Gemlik Bays have great dual importance with respect to trade and industry. In addition to this, the lands on the route of Motorway are very fertile so agriculture and farming are well developed in these regions. Therefore BOTEK has taken all of these important factors and conditions into consideration and design the motorway for future traffic flow and forthcoming necessity. BOTEK has also determined the conditions in order to protect the nature, agriculture and structures in the vicinity of the motorway from harmful effects of all sorts of materials used against icing on the surface of the motorway and on the structures and established systematic solutions for the installations and structures to be used for prevention and purification, and examined the design outlines of the motorway, connection and frontage roads and roadside installations from the viewpoint of harmony with nature and ensured the conformity of the motorway with its surroundings.

All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe)

Besides motorway works, BOTEK has also performed following activities:

  • Arrangement and planning ofside roads and facilities located alongside of the motorway
  • Derivation and rehabilitation of 3 streams around the interchanges.
  • Lighting Works comprising all motorway, toll plazas, parking areas, service and maintenance areas, over-passes, under-passes and interchanges to include transformers, lanterns, armatures, polls, cables, emergency generator and all other ancillary equipments and spares
  • Emergency communications system works include phones, cabling, power source, posts and other works and spares
  • Demolition, reconstruction or relocation of under or above ground electrical, telecommunication lines and drinking water installations

Project Summary

  • Motorway (2×3), (34km)
  • Side Roads(26km)
  • Motorway Interchange Bridges
  • State Highway Interchange Bridges
  •  Viaducts (Approx. 3312 m)
  • Toll plazas
  • Service Area
  • Car park
  • Culverts
  • Under-bridges
  • Over-bridges
  •  Motorway Bridges
  • State Highway Bridge
  • 34,605 m2 Retaining Walls

Services Provided

  • Field Survey
  • Geotechnical Survey
  • Feasibility Study
  • Preliminary Design
  • Final Motorway Design
  • Detailed Structural Design
  • Landscape Design
  • Environmental Impact Assessment and Pollution Prevention Studies
  • Traffic Signs and Signalization
  • Expropriation Plans
  • Cross Sections
  • Earthworks Calculations
  • Bruckner Calculations
  • Preparation of Bill of Quantities and Tender Assistance
57143f7ec9808

Project Description

This project consists of preliminary design and engineering consultancy services for 80 km (2×3) motorway in the south Turkey. Iskenderun-Antakya-Cilvegözü motorway is the extension of Iskenderun motorway which is the last section of the Edirne – Istanbul – Ankara – Tarsus – Adana – Gaziantep – Urfa Motorway Route named as TEM (Transit European Motorway)

TEM (Trans-European North-South Motorway) is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it has the total planned length amounting to 23797 km, out of which 7021 km are currently in operation. All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe).

Project Details

  • Culverts
  • Underbridges
  • Overbridges
  • Interchange Bridges
  • River Bridges
  • Viaducts
  • Motorway Interchanges
  • State Highway Interchange
  • At-Grade Interchange
  • Tunnels total length of 1260 m

Study objectives included investigation of the site conditions including geological, hydrological, and social conditions.

Services Provided

  • Preliminary and Application Design
  • Geotechnical Survey
  • Soil Investigation
  • Field Surveys
  • Earthworks Calculations
  • Bruckner Calculations
  • Cross Sections
  • Drainage Design
  • Preparation of Bill of Quantities
5714401958430

Project Description

Rapid traffic load increase derived from tourism, agriculture, and transit transportation required for a highway crossing study in Çanakkale Region. The Dardanelles suspension steel bridge with 2×3 lanes will provide a traffic flow which would ease the traffic problems of the region for the present and future.

Services Provided

  • Geotechnical Survey
  • Feasibility Survey
  • Preliminary and Application Design
  • Structural Detailed Design
  • Drainage Design
  • Environmental Impact Assessment
  • Cross Sections
  • Service Area Design

Project Details

Suspension Bridge
Suspension steel bridge 2×3 lanes
Total length 2196 m.
Span distances 1440 m.
Length of the approach span on each side: 378 m.

Kilitbahir Side Approach Motorway
Motorway with 2×3 lanes (7 km)

1 Elevated interchange
1 At-grade interchange
1 Toll plaza
3 Twin Tube Tunnels;
   T1 Tunnel: 1210.942 m + 1239.058 m
T2 Tunnel: 302.370   m + 307.630 m
   T3 Tunnel: 428.986   m + 421.015 m

1 Bridge

Çanakkale Side Approach Motorway
Motorway with 2×3 lanes (8 km)
1 Elevated interchange
1 Toll plaza
1600 m. Suspended Bridge Approach Viaduct
1 River Bridge
Intercity access road (5 km)

Roundabout

1 Bridge

Project Details

Suspension Bridge
Suspension steel bridge 2×3 lanes
Total length 2196 m.
Span distances 1440 m.
Length of the approach span on each side: 378 m.

Kilitbahir Side Approach Motorway
Motorway with 2×3 lanes (7 km)

1 Elevated interchange
1 At-grade interchange
1 Toll plaza
3 Tunnels total 2196 m.
1 Bridge

Çanakkale Side Approach Motorway
Motorway with 2×3 lanes (8 km)
1 Elevated interchange
1 Toll plaza
1600 m. Suspended Bridge Approach Viaduct
1 River Bridge
Intercity access road (5 km)

Roundabout

1 Bridge

5714487f5f5f1
5714489b84144
571448820fab0

Project Description

Besides Motorway Design, Construction Supervision and Engineering Services, BOTEK also performed supervision and design for the service buildings of General Directorate of Highways and Toll plazas.

This motorway project comprises two sections. Under the scope of these two sections following structures were built:

  • Maintenance & Operating Areas
  • Parking Areas
  • Service Areas
  • Toll plazas

Total square measure of construction area in three separate sections is 78.000 m2.

Maintenance & Operating areas contain:​

  • Administrative Buildings
  • Dinning Halls

Service Areas were constructed at two separate sections. These sections comprise all necessary managing and administrative buildings. Total square measure of service areas is 360.000 m2

Total square measure of parking areas and other constructed areas is 186.000 m2

In addition to service and parking areas, following structures were constructed in the scope of Pozanti – Tarsus – Mersin Motorway project.

  • Toll plazas
  • Police Stations
  • Gas Station
  • Operating Buildings

Services Provided

  • Cost Analysis
  • Design of Toll Plazas
  • Design of Administrative & Service Buildings
  • Construction Supervision
  • Quality Control

 

 

5714407571f12
5f9073c002051
5f9074022e64f

Project Description

Edirne-Kinali section of Trakya Highway is a part of TEM (Transit European Motorway) connecting East Europe to Middle East. The project consists of (2×3) 155 km. motorway and (2×2) connection roads (60 km) with earthworks, structures, bridges and viaducts, tunnels, pavement, security, traffic and secondary works. BOTEK had been associated with Ove Arup InternationalLondon on the project.

TEM (Trans-European North-South Motorway) is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it has the total planned length amounting to 23797 km, out of which 7021 km are currently in operation. All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe).

Services Provided

  • Field, Geotechnical and Geodetical Surveys
  • Soil Investigation
  • Preliminary and Final Design
  • Drainage Design
  • Cross Sections
  • Quality Control of Works
kopru
2
2.

Project Description

The project, the Second Suspension Bridge constructed in the Bosphorus Region, improves the highway connection among the continents; Asia Europe. The project consists of 1 suspension bridge with 2×4 lanes and sidewalks, and a total of 77.1 km peripheral motorway with viaducts and interchanges. BOTEK had been associated with Freeman Fox & Partners, London on the project, which is one of the most elegant, streamlined transportation structures to mark the Bosphorus Region.

For the original structure, BOTEK prepared the preliminary feasibility report, all preliminary works, final design of all highways and connecting roads and interchanges as well as construction supervision. The project also included approaches with complex interchanges to connecting express highways and local streets, service buildings, garages and toll plazas with complete toll facilities and related equipment.

1350 Million US $

Project Details

(2×3) Motorway, 150 km long
(2×2) Connection Roads 8.588 km long
16 Viaducts (Total length of 6553 m)
8 Toll Plazas
5 Parking Areas
10 Elevated Interchanges
2 Service Areas
20 River Bridges

(Total length of 2014 m)
2 Bridges

Hasdal-Okmeydani Connection 5.0 km.

Total 77.1 km

This motorway is a part of the TEM Motorway. TEM (Trans-European North-South Motorway) is a motorway network which connects the Baltic, Adriatic, Aegean and Black Seas and it has the total planned length amounting to 23797 km, out of which 7021 km are currently in operation.

All design and engineering works are made completely according to “TEM Standards and Recommended Practice” which is published by UNECE (United Nations Economic Commission for Europe).

Services Provided

  • Preliminary and Final Design
  • Detailed Bridge Design
  • Elevated Interchange, Viaduct and Suspension Bridge Design
  • Drainage Design
  • Service Area Design
  • Cross Sections
  • Supervision of Landscape Works
  • Supervision of Asphalt Pavement Works
  • Supervision of Cut-fill Works
  • Supervision of Motorway Electric-Electronic Works
  • Supervision of Major and Minor Structure Works
  • Quality Control of the Works
  • Monitoring and Inspection of the Construction
  • Preparation of Bill of Quantities
  • Expropriation Studies