Project Description
The Government of Georgia has received a grant from the International Development Association (IDA) for a Georgian infra-structure pre-investment facility (IPF). The purpose was for as detailed engineering design and preparation of bidding document based on World Bank standards for the 24km section of the E-60 Highway (this section) was between km56 and km80 (Iogeti-Sveniti). The section is located about 56 km. west from Tbilisi and is to be upgraded from a 2 lane to a 4 lane road
Services Provided
- Revision/Completion of the preliminary design
- Preparation of detailed design
- Preparation of the bidding documents
- Preparation of draft pre-qualification document (PQD)
- Work plan and time schedule
- Monthly progress reports
- Technical reports (geometrical design, pavement design, bridge and structure design, bill of quantity, cost estimate),
- Draft bidding documents
- Final bidding documents