Türkiye- Design and Engineering Services Tekirdağ – Muratlı Railway

Project Description

In the content of the TEKIRDAĞ – MURATLI – BÜYÜK KARIŞTIRAN RAILWAY project, 1/25000 scaled track survey and Forest Management Map, 1/2000 scaled Strip Map Preparation and tracing the track into those maps, Preparation of expropriation Plans, Making the Required Drillings and other Soil Survey Works over the track, Making Projects of Engineering Structures like; Tunnels, Bridges, Retaining Walls and Subway Station Facilities and Railway according to the Technical Provision Principles, Superstructure, Making Projects of Electrification, Signalization, and Telecommunications, Preparation of EIA report, Feasibility Study of the track and reconnaissance and bill of quantities of track and tender documentation preparation  of  double lined Tekirdag-Murali-Buyuk Karistiran Railway Line having general standards maximum slope  %012,5 and minimum Radius curve of 3000m. (in obligatory places with the approval of the Client it can be changed.)

Services Provided

  • Prepare the alignment alternatives
  • Preparation of detailed Design
  • Geotechnical Survey