Türkiye- Pınarbaşı – Gurun Yolu Preliminary and Final Project Services

Project Description

The project includes Preliminary and Final Design Services for 48km (2×2) road.

Services Provided

  • Corridor Survey
  • Mapping Works
  • Determination of Horizontal and Vertical Alignment and Preparation of the Reports
  • Hydrological and Hydraulic Surveys
  • Bridge and Interchange Design
  • Hydraulic Culvert and Underpass Designs
  • Drawings and Preparation of Final Report
  • Drainage Works
  • Bill of Quantities
  • Traffic Studies
  • Landscape Design