Project Description
Preliminary and Final Design of 29 kilometer (2X3) State Motorway.
- 29 Km Final Project
- 29 Km Geotechnical Investigation Engineering Work
- No. 12 (25600 m2) Bridge Projects Works
- 29 Km Traffic Project Works
Services Provided
- Horizontal and Vertical Alignment Studies
- Preliminary and Final Design
- Detailed Bridge Design
- Drainage Design
- Geological Studies
- Hydrogeological Studies
- Geotechnical Studies