Project Description
The purpose of this project is to connect TEM highway to GAP (South Anatolia Project). The highway consists of a 37 km. highway, 17 km. connection roads as well as 3 overpasses 150 m. long, 16 underpasses 192 m. long, a bridge of 40 m. of length and four (bridged type) junctions.
Project Details
- Approximately 15,000,000 m³ of earth works,
- 156,000 m³ of concrete, 1,256,000 tons of sub- base,
- 896,000 tons of mechanic stabilization base and
- 762,000 tons of bituminous hot mix asphalt works were realized.
Services Provided
- Preliminary and Final Design
- Detailed Bridge Design
- Elevated Interchange, Viaduct and Suspension Bridge Design
- Drainage Design
- Service Area Design