This Project is executed according to the FIDIC (MDBs) Harmonized Edition 2010. Funded by Saudi Fund for Development (SFD)
Project Description
The Ministry of Infrastructure plans to continue widening of the M2 national road, Pristina-Mitrovica, the project is designed to expand the M2 national road, from the Lum i Madh to the exit of Vushtrri. In this Consulting Service, is required to review, design and construction supervision of National Road M2: segment Lumi Madh – Vushtrri – Mitrovica. The beginning of the track is at Lumi Madh village and the end of the track will be at the entrance to Mitrovica (L=20km), the final points will be assigned by the Ministry of Infrastructure. Task 1 – Detailed Engineering Design (the section from 21.50km to 26.7km); Task 2 – Review of Existing Detail Design Documents (the section from 7.165km to 16.95km); Task 3 – Preparation of Technical Specification and Bidding Documents including selection, evaluation and recommendation on the qualified contractors for both sections Task 4 – Supervision of Works and Contract management along with IPC certification and approvals for both sections.
Services Provided
BOTEK will perform in following Task:
- Preparation the Detailed Engineering Design (the section from 21.50km to 26.7km);
- Review of Existing Detail Design (the section from 7.165km to 16.95km);
- Assistances in Preparation of Technical Specification and Bidding Documents, evaluation and recommendation on the qualified contractors;
- Supervision of Works and Contract management along with IPC certification and approvals (the section from 7.165km to 16.95km and section from 21.50km to 26.7km).