Project Description:
- Preliminary and Detailed Design of 3,2 km tunnel(2×2)
- Preliminary and Detailed Design 3 km approach roads
- Preliminary and Detailed Design 2 interchanges
- Tunnel Cross-sectional area (m^2) is 90/110
- Tunnel Length is 3.176 m
- Tunnel diameter is 10.40
Services Provided:
- Survey & Mapping
- Preliminary and Detailed Design of Highways and Tunnel
- Geotechnical Works
- Geology Report
- Bill of Quantities
- Specifications
- Tunnel Support System
- Electromechanical Works (ventilation, firefighting system, electrical signalization, tunnel controlling system)