Türkiye- Preliminary and Final Design Engineering Services for Eskişehir – City Crossing

Project Description

The project purpose was for the preparation of preliminary and final design of 2 major interchanges and (2×3) connecting roads. The pre-existing state highway was a two lane dual carriageway intersecting the city through these two interchanges. The upgrade was for these two major intersections and related roads enhanced provide of a smoother traffic flow pattern through rush-hours during serious traffic congestion.

All of the technical studies, field investigations and related services for the detailed design stage of the project were perform finalized by BOTEK.

Estimated Construction Cost: 20 Million US $

Project Details

Interchanges

Bridges with Spans

Underbridges

Diamond Interchanges

Box Sectional Underbridges

Services Provided

  • Field Survey
  • Geotechnical Survey
  • Preliminary Design
  • Final Highway Design
  • Structural Detailed Design
  • Drainage Design
  • Cross Sections
  • Earthworks Calculations
  • Bruckner Calculations
  • Preparation of Bill of Quantities
  • Tender Assistance